Similar Projects
PCC Patching - Iowa 10
Infrastructure
Bidding
$500,000 CJ est. value
Marathon, IA 50565

PCC Patching - Iowa 10
Infrastructure
Bidding
$500,000 CJ est. value
Marathon, IA 50565

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Parking Lot B Reconstruction
Infrastructure
Post-Bid
$600,000 CJ est. value
Storm Lake, IA 50588

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

Iowa Central Community College - RFQ Construction Management at Risk Services
New Construction, Renovation, Infrastructure
Post-Bid
$50,000 CJ est. value
Storm Lake, IA 50588

Granular Surfacing of Roadway
Infrastructure
Results

Storm Lake CSD Baseball Turf Replacement
Infrastructure
Post-Bid
$700,000 CJ est. value
Storm Lake, IA 50588

Cherokee & 9th Stormwater Improvements
Infrastructure
Results
$445,000 est. value
Alta, IA 51002

New Production Well No. 21
Infrastructure
Post-Bid
$1,100,000 CJ est. value
Storm Lake, IA 50588

Richland St - PCC Pavement - Replace
Infrastructure
Results
$2,000,000 est. value
Storm Lake, IA

Storm Lake Elementary Playground
New Construction
Results
$500,000 est. value
Storm Lake, IA 50588

Last Updated 05/08/2023 10:08 AM
Project Title

City Park - City of Alta

Physical Address View project details and contacts
City, State (County) Alta, IA 51002   (Buena Vista County)
Category(s) Entertainment/Recreation, Government/Public, Heavy and Highway
Sub-Category(s) Golf Course, Misc. Buildings, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $475,600 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project calls for adding pods of playground equipment, a recreation trail, disc golf and permanent facilities for games like table tennis and bags in the park. As of March 30, 2022, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As of May 8, 2023 no new information available

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents