Similar Projects
Waves Dania Beach Mixed-Use
New Construction, Infrastructure - 1,300,000 SF
Design
$200,000,000 CJ est. value
Dania Beach, FL 33004

Waves Dania Beach Mixed-Use
New Construction, Infrastructure - 1,300,000 SF
Design
$200,000,000 CJ est. value
Dania Beach, FL 33004

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

River Oaks Stormwater Improvements (P11868)
Infrastructure
Results
$22,093,982 CJ est. value
Fort Lauderdale, FL 33301

Manors of Inverrary / Safe Neighborhood Improvement District Roadway Paving and Milling
Infrastructure
Results
Lauderhill, FL 33313

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Millennium Townhouses
New Construction, Infrastructure - 10,916 SF
Construction
$4,000,000 CJ est. value
Fort Lauderdale, FL 33305

RFQ - Redevelop the Existing East and West Buildings of the Fort Lauderdale Aquatic Complex
Demolition, New Construction, Infrastructure
Pending Verification
$70,900,000 CJ est. value
Fort Lauderdale, FL 33316

New River Central
New Construction, Infrastructure - 5,697 SF
Pending Verification
$125,000,000 CJ est. value
Fort Lauderdale, FL 33301

Arthur Street Multifamily
New Construction, Infrastructure - 13,783 SF
Design
$2,300,000 CJ est. value
Hollywood, FL 33020

Hollywood Boulevard Mixed Use / Hollywood
New Construction, Infrastructure - 290,712 SF
Post-Bid
$22,000,000 CJ est. value
Hollywood, FL 33020

MIRA 001- Pembroke Road Expansion from SW 160th Avenue to 184th Avenue, MIRA 002 - Pembroke Road Expansion from SW 184th Avenue to 200th Avenue, MIRA 003 - Pembroke Road Expansion from SW 200th Avenue to US-27, MIRA 004 - Miramar Parkway Extension to Pembroke Road
Infrastructure
Results
$5,930,000 est. value
Miramar, Pembroke Pines, FL 33027

Spirit Airlines Corporate Headquarters / Campus
New Construction, Infrastructure
Construction
$250,000,000 CJ est. value
Dania Beach, FL 33004

Homewood Suites by Hilton
New Construction, Infrastructure - 105,747 SF
Pending Verification
$10,000,000 CJ est. value
Fort Lauderdale, FL 33308

Last Updated 06/28/2023 08:08 PM
Project Title

South Ocean Drive Bridge Replacement - Rebid

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33316   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is located at South Ocean Drive between Mayan Drive and Marion Drive, in the City of Fort Lauderdale, Florida. The work to be accomplished under this contract includes, but is not limited to, complete demolition of the existing bridge and construction of a new bridge in the same location. Drawing Plans: The building plans, blueprints, schematic drawings, and diagrams, including draft, preliminary, and final formats, which depict the internal layout and structural elements of the Project are exempt from public record pursuant to Section 119.071, Florida Statutes (2022). Interested parties must log into INFOR.COM to access the City of Fort Lauderdale Plans Request Form, AND must follow the instructions contained therein. Access to the site visit (if any) is only available to pre-approved plans-holders originating from the City of Fort Lauderdale Plans Request Form. Non-approved attendees will not be allowed to participate in the site visit. To avoid any issues, Plans Custodians should bring proof of approval to the site visit. While attendance is not mandatory, it is strongly suggested that all contractors participate in the pre-bid conference. It will be the sole responsibility of the bidder to inspect the City s location and become familiar with the scope of the Citys requirements and systems prior to participating in the pre-bid meeting and submitting an offer. Time is of the essence throughout this Contract. Contractor must obtain Substantial Completion of the Work within three hundred (300) days after the Project Initiation Date specified in the Second Notice to Proceed, and Final Completion within sixty (60) days after the date of Substantial Completion. A certified check, cashiers check, bank officers check or bid bond for FIVE percent (5%) of the bid amount, made payable to the City of Fort Lauderdale, Florida, shall accompany each offer.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents