Similar Projects
Silicone Joint Sealer
Infrastructure
Bidding

Widening
Infrastructure
Bidding
$62,851,172 est. value
FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Undergrounding of Overhead Utilities and Streetscape
Results
Less than $10,000,000 est. value
Hollywood, FL 33022

Paved Shoulder Repair
Results
Less than $500,000 est. value

Southwest 37th Terrace Stormwater Improvements
Infrastructure
Bidding
Dania Beach, FL 33312

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Resurfacing
Results
Less than $3,209,636 est. value
FL

NW 70th Avenue Traffic Calming Project (Mobility Advancement Project)
Infrastructure
Bidding
$494,000 est. value
Tamarac, FL 33309

Accessways and Driveways Construction Services, Roadway Maintenance Services, and Drainage Services
Renovation
Post-Bid
Hollywood, FL

Interchange Improvement
Results
Less than $358,465 est. value
FL

Island Mobility Improvements Project
Infrastructure
Bidding
$947,000 est. value
Deerfield Beach, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Resurfacing
Results
Less than $1,074,084 est. value
Hollywood, FL

Last Updated 03/25/2022 12:01 PM
Project Title

Manors of Inverrary / Safe Neighborhood Improvement District Roadway Paving and Milling

Physical Address View project details and contacts
City, State (County) Lauderhill, FL 33313   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide milling and paving for approximately 136,000 sq. ft. at an average depth of one inch throughout the Manors of Inverrary. The work includes, but is not limited to, the following: 1. All surfaces to be paved will need to be clean of all loose materials, dirt, etc. 2. Saw cut or bump mill a 1” perimeter of asphalt around all edges to sidewalks, walkways, storm drain frames, manholes, etc., in areas to be overlaid. 3. Remove and dispose of all excavated material.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents