Similar Projects
Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

EE Lot Cleanups 2020-5-19 Various Residential/Commercial Lot Cleanup Abatement Projects
Post-Bid
Pensacola, FL 32526

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Annual Purchase Agreement for Aluminum Covered Canopy and Bus Ramps at Various District Facilities
Results
Pensacola, FL 32503

Perdido Key Fire Station Concrete Repairs
Results
FL

Devilliers Street Revitalization, Phase 1: from Main Street to Garden Street
Results
Pensacola, FL

Devilliers Street Revitalization, Phase 2: From Garden Street to Cervantes Street
Results
Pensacola, FL

Reus Street Revitalization, Phase 2: From Garden Street to Cervantes Street
Results
Pensacola, FL

Reus Street Revitalization, Phase 1: from Main Street to Garden Street
Results
Pensacola, FL 32502

Traffic Division - ADA Curb Ramp Upgrades
Results
FL

Pensacola International Airport 9th Avenue Remote Parking Lot
Results
Pensacola, FL 32504

Woodland Heights Community Center Parking Lot Expansion
Results
Pensacola, FL 32503

Escambia County Health Care Center Parking Lot Re-Surface and Re-Stripe
Results
Pensacola, FL 32502

Traffic Division - ADA Curb Ramp Upgrades #3
Results
Less than $24,999 est. value
FL

Pedestrian Safety/Traffic Signals/Drainage Improvements/Fencing
Results
Less than $6,738,688 est. value
FL

Last Updated 02/10/2021 03:19 PM
Project Title

Chemstrand Road (Nine Mile to Ten Mile) Drainage and Pedestrian Upgrades Project

Physical Address View project details and contacts
City, State (County) FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,989,955
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of constructing paved shoulders, curb & gutter, and sidewalks to Chemstrand Road from Nine Mile Road to Ten Mile Road. Project will include other work associated with the resurfacing and widening of the roadway such as stormwater conveyance system, drainage swales, potable water relocation, underground utility adjustments, concrete driveway connections, maintenance of traffic, stormwater pollution prevention, sodding, shoulder work, pavement striping, mailbox replacement, etc. Due to the current ADT on this road, the contractor shall maintain traffic flow at all times with minimal delays.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Driveways, Paving Specialties, Pavement Markings, Turf and Grasses, Sodding.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents