Similar Projects
Port Angeles Marine Trades Center Building
New Construction, Renovation
Conception
$1,000,000 to $5,000,000 est. value
Port Angeles, WA 98363

RFQ Contractor - NRM Roof Project
Renovation
Conception
$500,000 est. value
Clarkston, WA

MAMC, JBLM, WA Repair Building 9906
Build-out, Renovation
Bidding
$10,000,000 CJ est. value
Joint Base Lewis McChord, WA 98431

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Repair Building 09175, Permanent Party UH
New Construction
Post-Bid
WA

Building 09705 Maintenance Shop Repairs
Renovation
Results
$60,000 to $66,600 est. value
Camp Murray, WA

Washington National Guard - Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
Fairchild Air Force Base, WA

ASOG Complex
New Construction, Infrastructure - 71,600 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Camp Murray, WA

NUWC Building 82 - Storefront
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Keyport, WA 98345

Three Story Barracks UEPH JBLM
New Construction
Post-Bid
$25,000,000 to $100,000,000 est. value
WA

Navy Replace Boilers Buildings 1950, 13910 and 13914
Renovation
Post-Bid
Everett, WA

NAVFAC D/B Provide & Install New HVAC & Chiller Systems, Bldg. 7450
Build-out, Renovation
Post-Bid
$5,000,000 CJ est. value
Silverdale, WA 98383

Replace Transfer Switches Buildings 11596 and 12430
Renovation
Post-Bid
$25,000 to $100,000 est. value
WA

Enclose Awning B1187, NSPS, Bremerton
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Silverdale, WA

Install Weather Protection Structure, B983 PSNS
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Bangor, WA 98383

Last Updated 09/22/2022 12:36 PM
Project Title

USACE Repair Morgue Cooler

Physical Address View project details and contacts
City, State (County) Joint Base Lewis McChord, WA 98439   (Pierce County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

.1 Project Description: The objective of this project is for the Contractor to provide all labor, materials and equipment necessary to repair by replacement the morgue cooler and provide temporary morgue cooler during repair actions at Madigan Army Medical Center (Bldg 9040), Joint Base Lewis McChord, WA, in accordance with all Federal, State, and Installation codes and laws, to include preparation of a design as discussed below, Safety Procedures, Standard Operating Procedures and Manufacturer Requirements. Some work will be completed after normal duty hours and/or on weekends to minimize impact on departments. 2.1.1 Site Survey and Report: The site survey and report shall comply with the requirements of the basic contract. Prior to the site survey, the contractor shall complete the Pre-site Survey Checklist (provided in your base contract) to document that all required preparations for the site survey have been completed, to include developing a detailed schedule and coordinating with the Contracting Officer's Representative to identify required documents/information. The contractor shall schedule a pre-site survey teleconference prior to the site visit to discuss the information required by the checklist. Site survey will discuss power requirements of temporary cooler and propose methods to provide emergency power to unit. Existing cooler box is original to the building and the seams have developed leaks and connecting/locking bolts have gotten loose and damaged/missing possibly caused by settlement of building or compression of insulation. The evaporators are rusting internally and have caused repeated issues with clogging drain pan drains. 2.1.2 Design: The contractor shall prepare design documents to clearly describe their plan of work for completing the requirements of this project. The site survey report prepared under this task order shall serve as the basis for this design. The design documents shall address all aspects of the work to be performed, to include anticipated outages (number and duration), phasing requirements, transition space if required, etc. and be provided in 95% and 100% submittals. ITEMS TO BE INCLUDED IN DESIGN: The Design (as a minimum) to be submitted in two distinct stages of development. The submittals shall include, but not be limited to, the following. 1. Executive summary providing a brief description of the work. 2. Narrative description of work required, referencing study and design calculations. 3. Sequential listing of steps required for the repair/minor construction. 4. Work schedule. 5. Drawings, as applicable. Hard copies before final and as-builts may be half-size (11" x 17"). Electronic version of drawings shall be submitted in .pdf and AutoCAD version. AutoCAD drawings do not need to be bound for design submittals as long as all references are included. - General - Cover sheet, index of drawings, location map - Legend and abbreviations - Architectural - Floor plans/site plan - Mechanical - Floor plans - System diagrams - Details - Schedules - Controls - Electrical - Floor plans/site plan - One lines - Details - Schedules 6. Construction standards. 7. Calculations and analyses (where applicable). 8. Original scope of work. 9. Material take-offs. 10. Catalog cuts and equipment specs. 11. Manufacturers' installation procedures or execution specifications.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents