Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Sage Valley Apartments Phase 2
New Construction
Conception
West Valley City, UT

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

South Cairns Development
New Construction
Design
Sandy, UT 84070

Ronald McDonald House Renovation and Residential Units
Renovation - 1,634 SF
Bidding
Salt Lake City, UT 84102

South Temple Apartments
New Construction, Renovation - 159,240 SF
Sub-Bidding
$10,000,000 CJ est. value
Salt Lake City, UT 84111

The Zephyr
New Construction - 99,892 SF
Post-Bid
$6,827,300 est. value
Salt Lake City, UT 84101

Bonnyview Apartment
New Construction - 298,975 SF
Post-Bid
$60,110,108 est. value
Murray, UT 84107

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II
New Construction - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT 84108

DFCM Construction - VBS CX Services - UU West Village Family and Graduate Housing
New Construction, Alteration - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT

The Residences at Sugar Alley
New Construction - 240,148 SF
Construction
$12,027,302 est. value
Salt Lake City, UT 84106

Sage Valley Apartments
New Construction - 704,593 SF
Construction
$47,000,000 est. value
West Valley City, UT 84044

Jasper Apartments
New Construction - 138,350 SF
Pending Verification
$10,000,000 CJ est. value
Millcreek, UT

Mixed Use Development
New Construction
Pending Verification
Murray, UT 84107

Mixed Use Project
New Construction
Conception
$1,150,000 est. value
Salt Lake City, UT 84102

Last Updated 03/14/2022 05:54 PM
Project Title

Sole at Rockwell Point

Physical Address View project details and contacts
City, State (County) Draper, UT 84020   (Salt Lake County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, 5 Stories Above Grade, New Construction, 506 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents