Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

Architect Engineering Prequalification
New Construction
Bidding
CO

Architect Engineering Prequalification
New Construction
Bidding
CO

Community Development Block Grant Consolidated Plan Consultant
Post-Bid
Commerce City, CO

Community Development Block Grant Consolidated Plan Consultant
Post-Bid
Commerce City, CO

C--CO, AZ and NM A/E Professional Services IDIQ
Results
$2,500 to $5,000,000 est. value

C--CO, AZ and NM A/E Professional Services IDIQ
Results
$2,500 to $5,000,000 est. value

Full Service Design IDIQ
New Construction
Design

DEN On-Call Architectural and Planning Design - SBE Defined Pool
Infrastructure
Bidding
CO

Engineering Services for Griswold WPF HVAC System Upgrades
Post-Bid
Less than $1,300,000 est. value
Aurora, CO 80012

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

DEN On-Call Technical Support Services Automated Guideway Transportation System
Addition
Bidding
Denver, CO

Land Survey Professional Services On-Call
Post-Bid
Less than $2,500,000 est. value
Denver, CO 80202

Colorado Air and Space Port Subarea Plan
Results
Brighton, CO 80601

Reported 09/25/2021 12:00 AM
Project Title

1 Replace Chillers Fitzsimons Building, Phases 1 & 2 and 2 Upgrade Electrical Systems CU Denver Bldg phases 1 & 2

Physical Address View project details and contacts
City, State (County) Aurora, Denver, CO 80045 (Adams, Denver Counties)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project 1: 1. Phase 1 is devoted to preparation, including piping distribution modifications. Pipe changes will allow the distribution to be looped and provide for circulation without triggering emergency transfer. Independent circulation will allow periodic PM procedures. This includes four piping by-pass modifications with isolation valves and control valves and new BAS sequence of operation. The new looped system will also include water treatment upgrades to facilitate maintenance (to avoid water stagnation). Also, new "spot- cooling" will be added in a remote area of the distribution tunnel that has contributed to the reliability problem. 2. Proposed phase 2 will remove and install (3) three new high-efficient 280 TON water-cooled chillers to replace existing obsolete chillers. Project 2: 1. This project request will upgrade the electrical distribution system in two phases Please note: The electrical work being proposed as Phase 2 of 2 for this controlled maintenance project has also been submitted for FY 22-23 funding as a separate capital request due to the severity of the degradation of the electrical system. If the electrical work is funded as a capital request, this CM phase and scope will be removed from consideration as a controlled maintenance project.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents