Similar Projects
Brazos Lakes Mixed-Use Development
New Construction - 263,160 SF
Conception
$10,000,000 CJ est. value
Missouri City, TX 77459

Parkhaus Development
New Construction
Conception
New Braunfels, TX 78130

Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Office Building & Parking Garage
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75254

Life Time Fitness
New Construction - 253,000 SF
Post-Bid
$130,000,000 est. value
Shenandoah, TX

Women & Children’s Bed Tower and Associated Projects - Package 12
New Construction - 570,000 SF
Post-Bid
$10,000,000 CJ est. value
San Antonio, TX 78229

Parking Garage III
Results
El Paso, TX

Pressler Street Garage 2 - Design Build
Results
$21,500,000 est. value
Houston, TX 77030

Stacy Green
New Construction
Construction
Allen, TX 75013

Gatherings at Twin Creeks
New Construction
Construction
Allen, TX 75013

Northeast Methodist Hospital Parking Garage
Addition - 83,000 SF
Pending Verification
$6,300,000 est. value
San Antonio, TX 78233

4411 San Felipe Mixed Use
New Construction
Pending Verification
Houston, TX 77027

White Oak Mixed Use Development
New Construction
Conception
Houston, TX 77009

Costco Parking Garage
Renovation
Design
Dallas, TX 75236

Asphalt Parking Replacement
Post-Bid
Carthage, TX 75633

Last Updated 05/11/2020 08:27 AM
Project Title

Grade, ACP, STR, Mbgf, Pav Mrks, Signs

Physical Address View project details and contacts
City, State (County) TX   (La Salle County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,357,950
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 531.840 1 105 6020 Removing Stab Base & Asph Pav (12") Sy 217,404.000 2 110 6001 Excavation (Roadway) Cy 11,643.000 3 132 6007 Embankment (Final)(Ord Comp)(Ty d) Cy 15,964.000 4 164 6036 Drill Seeding (Perm) (Rural) (Clay) Ac 106.800 5 247 6041 Fl Bs (Cmp In Plc)(Tya Gr1-2)(Fnal Pos) Cy 59,030.000 6 275 6001 Cement Ton 1,522.000 7 275 6002 Cement Treat (Exist Matl) (6") Sy 229,177.000 8 310 6009 Prime Coat (Mc-30) Gal 62,270.000 9 354 6003 Plan & Text Asph Conc Pav(0" To 3") Sy 783.000 10 401 6001 Flowable Backfill Cy 204.000 11 420 6009 Cl a Conc (Collar) Ea 1.000 12 432 6002 Riprap (Conc)(5 In) Cy 18.000 13 432 6045 Riprap (Mow Strip)(4 In) Cy 82.000 14 438 6001 Cleaning And Sealing Existing Joints Lf 369.000 15 451 6024 Retrofit Rail (Ty Sstr) Lf 482.000 16 462 6010 Conc Box Culv (6 Ft x 3 Ft) Lf 138.000 17 462 6011 Conc Box Culv (6 Ft x 4 Ft) Lf 47.000 18 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 156.000 19 464 6008 Rc Pipe (Cl Iii)(36 In) Lf 12.000 20 464 6018 Rc Pipe (Cl Iv)(24 In) Lf 360.000 21 464 6080 Rc Pipe (Arch)(Cl v)(Des 3) Lf 57.000 22 466 6101 Headwall (Ch - Pw - 0) (Dia= 36 In) Ea 1.000 23 467 6219 Set (Ty i)(s= 6 Ft)(Hw= 5 Ft)(4:1) (c) Ea 2.000 24 467 6224 Set (Ty i)(s= 6 Ft)(Hw= 6 Ft)(4:1) (c) Ea 6.000 25 467 6390 Set (Ty Ii) (24 In) (Rcp) (4: 1) (c) Ea 10.000 26 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (p) Ea 14.000 27 467 6419 Set (Ty Ii) (30 In) (Rcp) (4: 1) (c) Ea 10.000 28 467 6450 Set (Ty Ii) (36 In) (Rcp) (4: 1) (c) Ea 3.000 29 467 6545 Set (Ty Ii) (Des 3) (Rcp) (6: 1) (p) Ea 4.000 30 480 6001 Clean Exist Culverts Ea 30.000 31 496 6004 Remov Str (Set) Ea 32.000 32 496 6008 Remov Str (Box Culvert) Lf 185.000 33 500 6001 Mobilization Ls 1.000 34 502 6001 Barricades, Signs And Traffic Handling Mo 25.000 35 506 6003 Rock Filter Dams (Install) (Ty 3) Lf 330.000 36 506 6011 Rock Filter Dams (Remove) Lf 330.000 37 506 6020 Construction Exits (Install) (Ty 1) Sy 156.000 38 506 6024 Construction Exits (Remove) Sy 156.000 39 506 6030 Backhoe Work (Erosion & Sedmt Cont) Hr 163.000 40 506 6038 Temp Sedmt Cont Fence (Install) Lf 6,461.000 41 506 6039 Temp Sedmt Cont Fence (Remove) Lf 6,461.000 42 510 6002 One-Way Traf Cont (Pilot Car) Hr 80.000 43 510 6003 One-Way Traf Cont (Port Traf Sig) Mo 26.000 44 512 6094 Ptb (Fur & Inst)(Steel) Lf 5,130.000 45 512 6095 Ptb (Move)(Steel) Lf 112,860.000 46 512 6096 Ptb (Remove)(Steel) Lf 5,130.000 47 530 6004 Driveways (Conc) Sy 1,283.000 48 530 6005 Driveways (Acp) Sy 5,923.000 49 533 6003 Rumble Strips (Shoulder) Asphalt Lf 106,383.000 50 533 6004 Rumble Strips (Centerline) Asphalt Lf 53,184.000 51 540 6001 Mtl w-Beam Gd Fen (Tim Post) Lf 1,200.000 52 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 8.000 53 542 6001 Remove Metal Beam Guard Fence Lf 1,200.000 54 544 6001 Guardrail End Treatment (Install) Ea 8.000 55 544 6003 Guardrail End Treatment (Remove) Ea 8.000 56 545 6003 Crash Cush Atten (Move & Reset) Ea 98.000 57 545 6005 Crash Cush Atten (Remove) Ea 14.000 58 545 6019 Crash Cush Atten (Instl)(s)(n)(Tl3) Ea 14.000 59 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 32.000 60 644 6027 In Sm Rd Sn Sup&Am Tys80(1)Sa(p) Ea 4.000 61 658 6049 Instl Om Assm (Om-2z)(Flx)Gnd(Bi) Ea 74.000 62 658 6060 Remove Delin & Object Marker Assms Ea 52.000 63 658 6062 Instl Del Assm (d-Sw)Sz 1(Brf)Gf2(Bi) Ea 24.000 64 662 6050 Wk Zn Pav Mrk Remov (Refl) Ty Ii-a-a Ea 2,880.000 65 662 6063 Wk Zn Pav Mrk Remov (w)4"(Sld) Lf 16,800.000 66 662 6075 Wk Zn Pav Mrk Remov (w)24"(Sld) Lf 576.000 67 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 141,360.000 68 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty y-2 Ea 10,700.000 69 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 30.000 70 666 6224 Pavement Sealer 4" Lf 156,266.000 71 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 106,383.000 72 666 6312 Re Pm w/Ret Req Ty i (y)4"(Brk)(100mil) Lf 10,815.000 73 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 39,068.000 74 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 802.000 75 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 14,000.000 76 3076 6007 d-Gr Hma Ty-b Sac-b Pg70-22 Ton 60,065.000 77 3077 6033 Sp Mixes Sp-c Sac-a Pg76-22 Ton 21,845.000 78 3084 6001 Bonding Course Gal 19,094.000 79 6001 6002 Portable Changeable Message Sign Ea 4.000 80 6185 6002 Tma (Stationary) Day 120.000 81 6185 6003 Tma (Mobile Operation) Hr 300.000 82

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents