Similar Projects
The Registry on Grass Lake
New Construction
Conception
Winter Garden, FL 34787

Gem Lake - Phase 1 Master Plan
New Construction
Conception
Maitland, FL 32751

Uniq Hotel
New Construction, Addition
Design
Orlando, FL 32821

Epoch Aloma Senior Apartments
New Construction
Design
$36,000,000 est. value
Winter Park, FL 32792

Building Exterior Painting and Necessary Repairs
Renovation
Bidding
Winter Park, FL 32789

Orlando Health Physics Lab Garage and Covered Parking
New Construction
Results
$187,105 est. value
Orlando, FL 32800

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

Boggy Creek Road Mixed-Use Development
New Construction
Pending Verification
$10,000,000 CJ est. value
Orlando, FL 32824

Mixed-Use Tower
New Construction
Pending Verification
Orlando, FL 32801

Stoneybrook Senior Independent & Assisted Living
New Construction
Conception
Winter Garden, FL 34787

Hannibal Square Town Homes
New Construction - 240,048 SF
Design
Apopka, FL

City Center West Orange Apartments
New Construction - 323,000 SF
Construction
$18,000,000 est. value
Ocoee, FL 34761

Evermore Orlando Resort - Master Plan
New Construction
Pending Verification
Orlando, FL 32836

Torrey Preserve Apartments Phase 1
New Construction
Conception
Orlando, FL 32832

Last Updated 07/26/2021 02:11 PM
Project Title

520 Church Apartment Complex

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage
Contracting Method
Project Status Construction Commenced August 2018, Construction Nearing Completion 2021
Bids Due View project details and contacts
Estimated Value $70,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase II of a three-phased complex. Includes 16 retail/live/work studios, 4050 SF of retail/office space.

Details

1 Apartments/Condominiums, 14 Stories Above Grade, 350,000 SF New Construction 364 Unit(s), 1 Parking Garage, 6 Stories Above Grade, New Construction 630 Parking Spaces, 1.83 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Elevated Swimming Pools, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents