Similar Projects
Mesivta of Clifton Secondary School
Addition, Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Clifton, NJ 07014

Palestinian American Community Center
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Clifton, NJ 07011

Taco Bell Restaurant / Paterson
New Construction, Infrastructure - 1,679 SF
Design
$512,095 CJ est. value
Paterson, NJ 07501

Wallington Pumping Station Rehabilitation Project
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Passaic, NJ 07055

LDS Meetinghouse / Passaic
New Construction, Infrastructure - 8,910 SF
Bidding
$4,000,000 CJ est. value
Passaic, NJ 07055

Patriot Pickle - Mezzanine and Renovations
Renovation, Addition - 33,760 SF
Post-Bid
Wayne, NJ 07470

Fade And Exterior Improvements
Renovation
Post-Bid
Paterson, NJ 07501

Red Twig Trail Road Improvements
Results
$650,000 to $700,000 est. value
Bloomingdale, NJ 07403

Ward Street Parking Garage - General Construction
New Construction, Infrastructure
Results
$21,200,000 CJ est. value
Paterson, NJ 07505

Colfax Avenue Industrial Building
New Construction, Demolition - 18,501 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Clifton, NJ 07013

The Manor at Little Falls
New Construction, Renovation - 51,220 SF
Pending Verification
$10,000,000 est. value
Little Falls, NJ 07424

NES Group Distribution Center Addition
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Clifton, NJ 07012

Impact Steel Totowa
Addition, Infrastructure - 1,767 SF
Design
$375,000 CJ est. value
Totowa, NJ 07512

Post Brook Dam Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Ringwood, NJ 07456

Great Falls Youth Center Expansion and Auxiliary Building
Addition
Post-Bid
Paterson, NJ 07522

Last Updated 12/09/2022 03:36 PM
Project Title

Commerce Way Flex Warehouse Building

Physical Address View project details and contacts
City, State (County) Totowa, NJ 07512   (Passaic County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 9, 2022, the project is in planning. Information regarding an architect and general contractor has not been announced. A firm construction timeline has not been established. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

253,443 SF. 1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents