Similar Projects
Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

The Wharf
New Construction - 11,982 SF
Design
$965,056 est. value
Saint Augustine, FL 32084

Tribute by Marriott
New Construction
Post-Bid
$12,000,000 est. value
Saint Augustine, FL 32080

Construction of New Public Boat Ramp and Restroom
Post-Bid
Less than $2,491,313 est. value
Clermont, FL 34711

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Trout River Floating Dock Demolition
Results
Less than $56,060 est. value
Jacksonville, FL

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

North Cargo Berth 8 Extension
Construction
Less than $8,000,000 est. value
Cape Canaveral, FL 32920

Homestead Bayfornt Park - Boat Launch Repair
Post-Bid
Less than $98,400 est. value
Homestead, FL 33033

Carl Gray Park Boat Ramp Improvements
Results
$250,000 est. value
Panama City, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Post-Bid
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

DeSoto Park ADA Floating Kayak Launch
Post-Bid
Satellite Beach, FL 32937

Design Build Services For Marine Projects- Annual Contract
Term Contract
Results
Jacksonville, FL 32099

Last Updated 11/25/2019 10:30 AM
Project Title

Bella Vista Park Dock Reconstruction

Physical Address View project details and contacts
City, State (County) Sunny Isles Beach, FL 33160   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

contractor capable of providing all services associated with the removal of damaged sections of original dock located at 500 Sunny Isles Boulevard. Upon contract award, the contractor will reconstruct dock to original configuration pending permit approvals. New dock to consist of sleeving existing pilings with PVC pipe and filling with a concrete grout, constructing joists and stringers using 3" x 8" pressure treated lumber and stainless steel hardware, installing new fiberglass composite mesh decking, water lines and electric lines, lights and pedestals, install float-on kayak launching dock and stairs. No power or utilities are at the site. The selected contractor should expect to attend meetings with City staff, engineer. Contractor should also expect to present a phased approach for permitting, planning, design and implementation of the proposed improvements. The selected firm will be expected to assist the City in the preparation and submittal of the appropriate regulatory permitting associated with the replacement of the docks.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents