Similar Projects
Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Septic and Well Assistance Program - Service Providers
Infrastructure
Bidding
Richmond, VA

Installation of Alternative Onsite Sewage System
Infrastructure
Bidding
$400,000 est. value
Richmond, VA 23231

Manhole Rehabilitation and Replacement Project
Post-Bid
$1,000,000 to $2,999,999 est. value
Bristol, VA

Burlington #1158
Renovation
Post-Bid
Vienna, VA 22182

Donnagail Sewer Line Replacement
Results
Penn Laird, VA 22846

Repair/Replace Underground Utilities Sanitary Sewer Rehabilitation - Phase II
Results
$3,000,000 est. value
Fredericksburg, VA

18th Street Sanitary Sewer Renewal
Infrastructure
Bidding
$2,000,000 est. value
Chesapeake, VA 23324

Targeted Sanitary Sewer Point Repairs
Infrastructure
Post-Bid
Front Royal, VA

Installation and Removal of Submersible Well Pump
Results
VA

Sanitary Sewer Easement Clearing
Term Contract, Infrastructure
Bidding
Fairfax, VA

Construction of North Holly IIIB Watershed Improvements
Infrastructure
Post-Bid
Virginia Beach, VA

Septage Hauling Unloading Station Improvements
Results
Richmond, VA

Materials for Water, Sewer and Storm Water Installation
Term Contract
Bidding
Lynchburg, VA

Reported 06/28/2022 05:10 PM
Project Title

Large Capacity - Commonwealth Avenue and East Glebe and Ashby Street and Glebe Road - City of Alexandria

Physical Address View project details and contacts
City, State (County) Alexandria, VA 22314   (Alexandria City County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $39,040,100
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the design and implementation of two large-scale capital projects to address capacity and flooding issues at the intersection of Commonwealth Avenue and East Glebe Road and Ashby Street and East Glebe Road under Flood Action Alexandria. In the Four Mile Run Watershed, a series of smaller storm sewer systems converge at the intersections of Commonwealth Avenue and East Glebe Road, and Ashby Street and East Glebe Road. During high intensity storm events, the drainage network becomes over capacity and unable to accommodate heavy discharge from multiple upstream systems in tandem, that creates flooding impacts. The project is included in the City of Alexandria's FY 2023-2032 Capital Improvement Program (CIP). As of June 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents