Similar Projects
Highway and/or Bridge Design and Engineering Services
Design
Less than $80,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Bidding
Less than $45,000,000 est. value
Washington, DC

Lead Monitoring and Technical Services
Bidding

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

Design, Engineering, Construction, and Technical Services for installation/relocation of Radiation Portal Monitors
Post-Bid

N62470-17-R-4010 Professional Services supporting NAVFAC AOR with a concentration of work in the Continental United States, the Caribbean, Europe, Africa, and South Western Asia
Results
Less than $45,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Bidding

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Corrosion Engineering Services
Results
$100,000 to $13,500,000 est. value

2020 Professional Services
Post-Bid
Bergenfield, NJ 07621

Operations and Maintenance Engineering Enhancement
Results
Less than $990,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Post-Bid
Less than $10,000,000 est. value

AE Environmental Services - NE Area
Results
$10,000 to $9,900,000 est. value

Reported 04/07/2021 12:00 AM
Project Title

Preliminary Engineering for the East Anderson Street/Cedar Lane Bridge Replacement in the City of Hackensack and Township of Teaneck, Bergen County, New Jersey

Physical Address View project details and contacts
City, State (County) Hackensack, Teaneck, NJ   (Bergen County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The County of Bergen, through a federally funded Local Capital Project Delivery (LCPD) Program administered by North Jersey Transportation Planning Authority (NJTPA), has, in close cooperation with New Jersey Department of Transportation (NJDOT) Local Aid District 2, undertaken the East Anderson Street/Cedar Lane Bridge (State Structure No. 020023A/County Structure No. 23A) bridge replacement project to address critical structural deficiencies, geometric and operational deficiencies, to better accommodate all modes of transportation, walking, bicycling, public transit and to provide ADA compliant pedestrian facilities. The intent of this project is to replace the existing structure to support current AASHTO’s HL-93 Truck model and reopen 4 lanes of through traffic within the project limits of this important multimodal link between Hackensack and Teaneck along CR 60 (see page 10 Location Map) through bridge replacement, improvements to current roadway geometry and intersection approach configurations, and the elimination of substandard roadway elements. The Local Concept Development (LCD) phase of the LCPD Program for the East Anderson Street/Cedar Lane Bridge replacement project has been recently completed and the project has been approved to advance to the Local Preliminary Engineering (LPE) phase. Bergen County, in cooperation with the NJTPA and NJDOT, is requesting the services of a consulting engineering firm. The consultant is to provide preliminary engineering and environmental services for the replacement of the East Anderson Street/Cedar Lane Bridge and improvements to CR 60 roadway corridor between River Street, Hackensack and River Road, Teaneck. County Bridge 23A lies immediately east of the intersection on River Street and spans the Hackensack River. East Anderson Street/Cedar Lane is an east/west Urban Minor Arterial designated as County Route 60by Bergen County and according to the NJDOT 2015 Straight line Diagram, see page 11. The project limits along East Anderson Street/Cedar Lane are from the west terminus Mile Post (MP) 0.25 to the east terminus (MP) 0.62, from the intersection with River Street (CR503) to the intersection with of River Road. The preliminary engineering plans and environmental documentation for the proposed improvements must be developed based on the Preliminary Preferred Alternative (PPA) selected in the LCD phase to best meet the project purpose and need statement. The PPA is described in the LCD Report, dated June, 2020 (page 33). The project will include the replacement of East Anderson Street/Cedar Lane Bridge and roadway improvements along CR 60 between River Street, Hackensack and River Road, Teaneck. The Project goal is to address structural and geometric deficiencies of the East Anderson Street/Cedar Lane Bridge over the Hackensack River and to provide safe, efficient and reliable passage for all modes of transportation as outlined in the LCD report. The existing roadway is two lanes in each direction with the exception of a left–turn only lane and right-turn only lane onto River Street and a left-turn only lane onto River Road. The East Anderson Street/Cedar Lane Bridge (020023A) is a 6-span concrete prestressed box beam bridge, constructed in 1971. The structure is 304’ long by 74’ wide with four-12’ lanes, 5’ concrete sidewalks along both sides and 1’ inner and outer shoulders supported on reinforced concrete pier caps and concrete filled steel pipe piles. The existing bridge is in overall critical condition and is structurally deficient and functionally obsolete due to geometry. In 2012 due to structural deficiencies, a weight restriction was instituted, barring trucks, buses, and other vehicles over 15 tons from crossing the span. The two outer lanes of the bridge were also closed at that time and still remain closed.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents