Similar Projects
ASD Micron Middle School 435
Post-Bid
Lehi, UT 84043

Spanish Fork High School Bid Package 1
Post-Bid
Spanish Fork, UT 84660

Payson High School Rebuild and Maple Mountain High School Football Stadium and Track Renovation
Results
$90,000,000 est. value
Payson, UT 84651

CM/GC Mountain View High Diesel Mechanics Shop Remodel
Renovation
Results
Orem, UT 84057

Spanish Fork High School Rebuild
Construction
Spanish Fork, UT 84660

Mountain Sunrise Academy Charter School
New Construction - 40,096 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saratoga Springs, UT 84043

Micron Middle School Seminary
New Construction
Pending Verification
Lehi, UT 84043

Mountain View HS Diesel Shop Remodel
Renovation
Post-Bid
Orem, UT 84057

Usdb Springville Campus Portable Classroom Remodel
Renovation
Results
Less than $75,000 est. value
Springville, UT 84663

New Middle School for Alpine School District
New Construction
Construction
Less than $41,000,000 est. value
Lehi, UT 84043

General Contractor Building Safety and Security Canyon and Maple Ridge Elementary NEBO School District
Post-Bid
Mapleton, UT 84664

Cedar Valley High School - Site Modification and Asphalt for Modular Building
New Construction
Results
Eagle Mountain, UT 84005

Spring Canyon Middle School
Construction
Springville, UT 84663

Timpview High School Rebuild
New Construction, Renovation, Addition - 253,009 SF
Post-Bid
Provo, UT 84604

Bingham High Remodel - Phase III - Part II
Renovation
Results
South Jordan, UT

Reported 05/26/2021 12:00 AM
Project Title

Timpview High School Replacement

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $115,000,000
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The Construction Management/General Contractor (CM/GC) project includes the phased demolition and new construction of Timpview High School on the existing campus, excluding the main gymnasium, baseball field and the existing track & field. The site is approximately 37 acres. Only 30 acres are buildable space, with an additional 11 acres pending purchase to expand the campus to the south. The new Timpview High School will be approximately 400,000 square feet.

Details

1 Middle/Senior High School, Demolition, 1 Middle/Senior High School, 400,000 SF New Construction, 37 Acres.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents