Similar Projects
Davis Highway Apartments
New Construction - 127,680 SF
Conception
$35,000,000 est. value
Pensacola, FL 32514

East Hood Drive Subdivision
New Construction
Conception
Less than $4,000,000 est. value
Pensacola, FL 32534

Dollar General #24239 / Molino
New Construction, Infrastructure - 10,670 SF
Design
$1,000,000 CJ est. value
Molino, FL 32577

Hurricane Sally Repairs for Myrtle Grove Fire Station
Infrastructure
Design
$840,000 CJ est. value
Pensacola, FL 32506

Jones Swamp Floodplain Restoration and Expansion
Infrastructure
Bidding
$1,500,000 CJ est. value
Pensacola, FL 32501

Cantonment Well Water Treatment Facility
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Pensacola, FL 32501

Elevate Apartments North & South
New Construction
Post-Bid
Pensacola, FL 32526

A Street Revitalization Phase I From Garden Street To Cervantes Street
Infrastructure
Post-Bid
$600,000 CJ est. value
Pensacola, FL 32501

Muldoon Granular Activated Carbon (GAC) Filter Piping
Infrastructure
Results
$1,281,890 CJ est. value
Pensacola, FL 32501

Roger Scott Tennis Center Improvements
Infrastructure
Results
$3,090,559 CJ est. value
Pensacola, FL 32503

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bridge Repair/Rehabilitation
Infrastructure
Construction
$278,513 CJ est. value
Milton, FL 32583

O'Reilly Auto Parts #7 / Pensacola
New Construction, Infrastructure - 7,453 SF
Pending Verification
$500,000 CJ est. value
Pensacola, FL 32506

Dry Creek Subdivision
New Construction, Infrastructure
Pending Verification
$15,200,000 CJ est. value
Molino, FL 32577

Hammocks Subdivision
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Pensacola, FL 32526

Last Updated 01/06/2023 01:35 PM
Project Title

McVoy Townhomes

Physical Address View project details and contacts
City, State (County) Cantonment, FL 32533   (Escambia County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $48,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 128 townhome units. As of January 6, 2023, this project is in the early planning stages. No building permits have been issued by Escambia County at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Multi-Family Homes, New Construction, 128 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents