Reported | 11/10/2021 12:00 AM |
Project Title | Hurricane Florence Recovery Training and Storage Facilities at MCB Camp Lejeune |
Physical Address | View project details and contacts |
City, State (County) | Camp Lejeune, NC 28445 (Onslow County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Sub-Bidding |
Bids Due | View project details and contacts |
Estimated Value | $250,000,000 to $500,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | P1512 - MCCSSS Log Ops School Constructs a 148,700 square foot practical application facility for Military Occupancy Specialty (MOS)(Motor Transport) entry/intermediate level training, and a 22,100 square foot Joint Reception Center facility to include H/S functions and student in-processing functions for Marine Corps Combat Service Support School (MCCSSS) at Camp Johnson. Project will also renovate and convert the current MCCSSS motor transport training building M107 into a 109,600 square foot administrative and training center to support tenant and other TECOM functions. Constructs two low-rise steel frame multi-story academic and reception facilities with reinforced concrete masonry unit with reinforced masonry walls, brick veneer, reinforced concrete floors, and standing seam metal roof. These facilities includes academic, administrative and support space necessary to conduct the day-to-day operations of Log Ops School and MCCSSS in-processing. Site improvements include demolition, utilities, and parking. P1338 - II MEF Simulation Training Center Constructs a 53,500 square foot low-rise training facility to contain the II Marine Expeditionary Force (MEF) Battle Simulation Center and II MEF Combined Arms Staff Trainer (CAST). The facility will be constructed with secure storage space, containing multiple configurable training classrooms, Indoor Simulated Marksmanship Trainer - Enhanced (ISMT-E), audio/visual, computer and server room equipment spaces, and personnel and administrative support spaces. The building is on pile foundation with structural steel framing, reinforced masonry walls, brick veneer, reinforced concrete floors, and standing seam metal roof. Site improvements include demolition, utilities, and parking. P1527 - LOCCOM CSP Warehouse Replacement Constructs a 109,200 square foot low-rise steel frame warehouse facility for Logistics Command Consolidated Storage Program (LOGCOM CSP) with reinforced concrete masonry unit with reinforced masonry walls, brick veneer, reinforced concrete floors, and standing seam metal roof. Facilities will include the support space necessary to conduct the day-to-day operations. Site improvements include demolition, utilities, and parking. The anticipated completion time for this contract is 1,826 calendar days after award. |
||||||||||||||||||||||||||||||||
Details | ,, 421,000 SF - 1 Military Facility, Approximately 148,700 SF New Construction, 1 Military Facility, Approximately 109,600 SF Renovation, 1 Misc. Buildings, Approximately 53,500 SF New Construction, 1 Warehouse/Storage, Approximately 109,200 SF New Construction.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |