Similar Projects
Blacktop Project at Airpark
Bidding
Wintersville, OH 43953

Bellefontaine Regional Airport Runway 7-25 Rehabilitation
Bidding
Bellefontaine, OH 43311

Runway 22R Pavement Repair
Post-Bid
Wilmington, OH

Springfield-Beckley Municipal Airport Repair Runway 06-24 (Joint and Crack Sealing)
Post-Bid
Less than $130,913 est. value
Springfield, OH

Wind Cone Replacement
Results
Wilmington, OH

Airfield Improvements
Results
Put in Bay, OH

Rehabilitation and Crack Seal of Taxiway F
Bidding
Less than $70,000 est. value
North Canton, OH

Construct Apron C Expansion at Port Bucyrus-Crawford County Airport
Post-Bid
Less than $120,000 est. value
OH

Construct Taxiway
Results
Carroll, OH 43112

Delaware Municipal Airport Taxilane Reconstruction
Bidding
$720,592 est. value
Delaware, OH 43015

Rehabilitate Taxiway C at Port Bucyrus-Crawford County Airport
Post-Bid
Less than $95,000 est. value
OH

Taxiway “A2” Extension
Results
Less than $506,177 est. value
Urbana, OH 43078

Rehabilitate Northeast and Southeast GA Aprons and Taxilanes
Bidding
North Canton, OH

Airport Apron and Taxiway B Reconstruction
Post-Bid
$5,048,711 est. value
Cleveland, OH 44115

MRT - Apron Rehabilitation
Results
Marysville, OH 43040

Last Updated 11/20/2019 03:48 PM
Project Title

Design Services for Runway 5R-23L Rehabilitation and Modification of Standards (MOS Improvements Phase 2B

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Pavement coring, Geo-technical investigation and surveys 2. Survey data collection and submittal to FAA in accordance with FAA Advisory Circulars 150/5300-16B and 150/5300-18B. 3. Design of new, and repairs of, asphalt pavement in conformance with FAA standards 4. Preparation of safety/phasing plans and maintenance of traffic in accordance with FAA standards 5. Preparation of Financial Plans in accordance with FAA template ?Preparation of material specifications in accordance with FAA standards 6. Design of new, and repairs of, runway and/or taxiway edge light systems and airfield guidance signs in accordance with FAA standards 7. Relocations and adjustments of visual navigational aids - Precision Approach Path Indicator Lights (PAPI), Approach Lighting System with Sequenced Flashing Lights (ALSF-II), Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) 8. Airfield Electric Lighting Vault renovations to accommodate changes to airport lighting and guidance signs. 9. Site work design (storm drainage, grading, etc.) and storm water analysis in accordance with FAA, Franklin County standards 10. Various levels of cost estimating and scheduling 11. Project scheduling using Primavera P6 12. Project management using Primavera Contract Management 13. Life Cycle Analysis 14. Airspace analysis and any associated FAA submittals 15. Meeting coordination and attendance 16. Necessary outside agency (city, state, federal) coordination 17. Development of construction documents 18. Assistance with bidding/bid process management 19. A/E Services during construction, including inspection/observation during construction and acceptance materials testing 20. Other related activities

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents