Similar Projects
SR 826/Palmetto Expressway Capacity Improvement Project (FPID)
Bidding
Miami Lakes, FL 33014

Resurfacing
Bidding
$6,024,990 est. value
FL

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Miami Circle
Post-Bid
Miami, FL 33131

Roadway Improvements Project - Northeast 125th Street
Results
North Miami, FL 33161

Miscellaneous Roadway and Drainage Improvements
Results
Cutler Bay, FL 33189

Intersection Improvement
Bidding
$4,726,324 est. value
FL

DMS Courtyard Replacement
Post-Bid
Miami, FL 33128

Push Button Roadway Resurfacing-North
Results
Less than $1,620,984 est. value
Miami, FL

Railroad Intersection Improvement
Bidding
$34,326,701 est. value
FL

Jackson North Medical Center Asphalt Repairs (SBE Set Aside)
Post-Bid
Less than $50,000 est. value
Miami, FL 33169

Push Button Roadway Resurfacing- South
Results
Less than $1,620,984 est. value
Miami, FL

Push Button Intersection Improvements-North
Bidding
$1,583,934 est. value
FL

Roadway Improvements to NW 97 Avenue from NW 58 Street to NW 70 Street
Post-Bid
Less than $5,405,820 est. value
Miami, FL 33128

207th Street Right Lane Extension
Results
Less than $302,280 est. value
Miami Gardens, FL 33056

Reported 04/09/2020 12:00 AM
Project Title

Rickenbacker Causeway Green Bike Lanes Segment A - Phase I

Physical Address View project details and contacts
City, State (County) Miami, FL 33128   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $1,950,000
Plans Available from Agency's Affiliate - 03/05/20
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment and materials required for the Rickenbacker Causeway signing and pavement marking project including but not limited to: Modify the existing Rickenbacker Causeway dedicated bike lanes beginning at the toll plaza and ending at the Crandon Marina, with green coating painted bike lanes; Place pavement markings and reflective markers as buffers between vehicular and bicycle traffic; Install and replace traffic signs; Mill and resurface limited roadway pavement where through lane and turn lane were modified, at the location in front of the Miami Seaquarium; The total project roadway length is approximate 3.5 miles; The green paint on the William Powell Bridge is excluded from this project. With work further identified in the contract documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents