Similar Projects
Botanic Miramar Beach - Mixed Use
New Construction - 25,753 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miramar Beach, FL

The Southern Phase 2
New Construction
Conception
$40,700,000 est. value
Santa Rosa Beach, FL 32459

Bella Rosa Apartments
New Construction
Design
Santa Rosa Beach, FL

The Grove at Seascape Resort
New Construction - 10,000 SF
Design
Miramar Beach, FL 32550

North Spooky Lane Roadway Improvements and US 98 Pedestrian Facilities (North Watersound Parkway to CR 30A East)
Infrastructure
Bidding
$600,000 CJ est. value
Santa Rosa Beach, FL 32459

TDC Visitor Center and Administration Offices
Addition, Infrastructure
Bidding
$200,000 CJ est. value
Santa Rosa Beach, FL 32459

Chipotle #22007 / Miramar Beach
New Construction, Infrastructure - 2,325 SF
Sub-Bidding
$700,000 CJ est. value
Destin, FL 32550

Water, Sewer And Roadway At Woodlawn Commerce Park
Infrastructure
Post-Bid
Defuniak Springs, FL

interior modernization of our public housing units
Renovation
Post-Bid

Madison at Owl's Head Farm
New Construction
Construction
Freeport, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bishop Landing
New Construction, Infrastructure
Pending Verification
$79,800,000 CJ est. value
Santa Rosa Beach, FL 32459

Dollar General / DeFuniak Springs
New Construction, Infrastructure - 12,480 SF
Pending Verification
$3,000,000 CJ est. value
Defuniak Springs, FL 32433

Point Washington Preserve Phase 3B
New Construction
Conception
$7,500,000 est. value
Santa Rosa Beach, FL 32459

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Last Updated 11/04/2022 12:09 PM
Project Title

Encore at 331

Physical Address View project details and contacts
City, State (County) Freeport, FL 32439   (Walton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $97,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 258 apartment units. As of November 3, 2022, this project is in the early planning stages, and is pending approvals from Walton County. A general contractor has been selected, however, their information has not been provided at this time. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents