Similar Projects
Capital City Plaza - Phase II
New Construction - 550,000 SF
Conception
Atlanta, GA

Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

The Front Porch at Auburn Avenue
New Construction - 69,600 SF
Design
$18,000,000 est. value
Atlanta, GA 30312

FIFTY Tower
New Construction
Design
$450,000,000 est. value
Atlanta, GA 30308

Physical Activity Center Expansion
Addition, Demolition, Renovation, Infrastructure - 4,987 SF
Bidding
$5,000,000 CJ est. value
Roswell, GA 30075

Riverside Drive Stormwater Mitigation Project
Infrastructure
Bidding
$558,237 CJ est. value
Sandy Springs, GA 30328

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
College Park, GA 30337

Parking Deck Structure Repair at the CLL Building
Renovation
Post-Bid
Atlanta, GA 30303

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Results
College Park, GA 30349

T32-D7-PCC-District Wide-122083
Infrastructure
Results

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Expansion of Tech Square, Phase IIIA
Demolition, Infrastructure, Renovation - 119,000 SF
Pending Verification
$40,000,000 CJ est. value
Atlanta, GA 30334

Trinity Central Flats
New Construction - 7,500 SF
Conception
Atlanta, GA 30303

Last Updated 02/23/2023 10:07 AM
Project Title

First United Methodist Church Mixed-use Development

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30308   (Fulton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a mixed-use affordable housing development. Work includes renovations to the existing church facility. Phase 1 will include 170 units. As of February 23, 2023, the developer is still putting their financing together; and when successful, bidding could go out in 6 to 9 months. Construction could start a couple of months after it bids.

Details

New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents