Similar Projects
New Gymnasium for Los Alamos Middle School
New Construction - 20,000 SF
Conception
$7,000,000 to $12,000,000 est. value
Los Alamos, NM 87544

Taylor Middle School Classroom Block Construction
New Construction
Conception
$14,872,366 est. value
Albuquerque, NM 87114

Estancia Valley Classical Academy Expansion
Addition - 13,300 SF
Design
Edgewood, NM 87015

Chaparral Middle School Replacement
New Construction - 87,000 SF
Design
$8,000,000 est. value
Alamogordo, NM

Construction of the Loving Municipal Schools Miscellaneous New Facilities, Additions and Renovations
Renovation, Addition
Bidding
Albuquerque, NM

Job Order Contract - General Construction
Post-Bid
Clovis, NM

Portable Classrooms
Post-Bid
Shiprock, NM 87420

Mechanical Renovation for Artesia High School Gymnasium #3 HVAC Renovations
Renovation
Results
Artesia, NM 88210

Ramah Mid/High School Weight Room and Plaza Repairs
New Construction - 64,430 SF
Results
$871,135 est. value
Ramah, NM 87321

Construction of an Office/ Entry Addition to The Existing Multipurpose Building
Addition
Construction
Taos, NM 87571

San Miguel Facility Upgrades - 2020
Construction
$2,099,000 est. value
San Miguel, NM

SAMS Academy Charter School
New Construction - 37,125 SF
Pending Verification
$6,700,000 est. value
Albuquerque, NM 87114

McKinley Middle School Classroom Block & Admin Construction
New Construction
Conception
$14,709,736 est. value
Albuquerque, NM 87110

Nita M. Lowey 21st Century Community Learning Centers
New Construction
Post-Bid
Santa Fe, NM

Clayton High School Don R. Wood Auditorium ADA Restroom Upgrades and Huff Gymnasium Unisex ADA Restroom
Results
$142,500 est. value
Clayton, NM 88415

Reported 03/09/2022 12:00 AM
Project Title

Construction of Lynn Middle School Systems Upgrades

Physical Address View project details and contacts
City, State (County) Las Cruces, NM 88001   (Dona Ana County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Less than $5,400,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Lot #1, Base Bid: HVAC upgrade of the existing Main Building. The creation of a secure vestibule at the existing main entrance lobby. Site work includes new LED heads on existing light poles. Bid Lot #2: New VCT flooring, new carpet tiles, and new wall base throughout Main Building. Bid Lot #3: HVAC upgrade of the existing South Classroom Addition (Wing 100) Building. Bid Lot #4: Rooftop Package Unit replacement at the existing Gymnasium/Cafeteria/Music Building. Bid Lot #5: All Mechanical and Electrical work required to relocate existing kiln to room #214

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents