Similar Projects
Learning Together Academy
New Construction, Renovation - 8,792 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Margate, FL 33063

Cassia Commons
New Construction - 633,600 SF
Conception
$10,000,000 CJ est. value
Lauderdale Lakes, FL 33311

Armory Building at Dowdy Sports Field Renovation
Renovation - 12,000 SF
Design
$2,000,000 est. value
Hollywood, FL 33020

Monarch Lakes, Phase II
New Construction
Bidding
Miramar, FL 33027

Design/Build Caporella Park Enhancements Project - Step 2
Post-Bid
$3,085,452 est. value
Tamarac, FL 33321

Installation of Bleachers for the Ansin Sports Complex
Post-Bid
Miramar, FL 33027

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Design/Build Splash Pad at Betty Stradling Park
Results
Less than $300,000 est. value
Coral Springs, FL 33076

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Wawa # 5234 - Site Development
New Construction
Construction
$593,967 est. value
Fort Lauderdale, FL 33309

CVS # 4201 - Exterior ADA Improvements
Renovation
Post-Bid
$15,000 est. value
Fort Lauderdale, FL 33304

Forcina Park Renovations
Results
Miramar, FL 33025

Shoppes at Rio Vista - Bank of America Parking Lot
New Construction - 15,927 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fort Lauderdale, FL 33316

Centennial Park
New Construction - 4,000 SF
Post-Bid
$1,000,000 est. value
Pompano Beach, FL

2717 Van Buren Street Redevelopment Opportunity
Results
Hollywood, FL 33020

Last Updated 10/29/2021 09:11 AM
Project Title

Equestrian Center West Ring Improvement Project

Physical Address View project details and contacts
City, State (County) Parkland, FL 33067   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove six inches of the existing Gypsum sand and base layer of clay from the area indicated on the map. 2. Contractor will laser grade and compact existing native base. 3. Contractor will add and grade a fine concrete screening that is double crushed. 4. Contractor will furnish and install around the west arena wooden boarders consisting of 2”x 6” pressure treated wood. 5. Contractor shall install Cyclone sand at a depth of 4”. 6. Contractor will compact and final grade sand area. Contractor to compact and grade arena material. 7. Material will be sloped 1” per 20’ from the center for drainage. 8. Extracted material will be loaded by the Contractor for CITY use in the Farmers Market Field located next to the Equestrian Center. 9. The Contractor is responsible to furnish at its own expense, all supervision, equipment, machines, tools, materials, labor, material transportation and other facilities and services necessary to perform work specified herein

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents