Similar Projects
Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Post-Bid
Less than $3,000,000 est. value
West Palm Beach, FL 33401

Osceola Park Neighborhood Improvements (Phase II)
Post-Bid
Delray Beach, FL

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Shore Protection Project Jupiter Carlin Segment Beach Renourishment, Palm Beach County, Florida
Results
$10,000,000 to $15,000,000 est. value
Jupiter, FL

Original Section Drainage Improvements Phase 7
Post-Bid
$250,000 est. value
Greenacres, FL 33463

Wildflower Sewall Replacement
Results
Less than $1,550,000 est. value
Boca Raton, FL 33432

SE 8th Court Drainage Improvements
Post-Bid
$220,431 est. value
Delray Beach, FL

CEPP New Waters STA-2 Distribution Canal Clearing, Grubbing and Muck Removal
Results
$2,532,000 to $2,799,000 est. value
West Palm Beach, FL 33406

Construction and Installation of a Fully Functional Culvert Outfall System within the Lake Worth Drainage District E-1W-S Canal
Results
Delray Beach, FL 33484

Osceola Park Neighborhood Improvements (Phase 1)
Results
Less than $5,000,000 est. value
Delray Beach, FL 33444

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Stormwater Retaining Wall and Drainage Improvements
Results
FL 33469

Original Section Drainage Improvements Phase 6
Results
Greenacres, FL 33463

STA-1E Western Flow-Way Modifications - Imported Soil
Results
Less than $30,000,000 est. value
West Palm Beach, FL 33406

Reported 12/19/2019 12:00 AM
Project Title

Shore Protection Project (SPP) Mid-Town Segment and Phipps Ocean Park (Reach 7) Beach Renourishment 2019

Physical Address View project details and contacts
City, State (County) Palm Beach, FL 33404   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project will be split between base and two options for the placement of beach compatible material within the Town of Palm Beach, Florida. Base and Option A work will be performed along the 2.8 mile segment known as Mid-Town Segment. Option B work will be along the 1.6 mile segment known as Phipps Ocean Park. The two placement areas are separated by 3.4 miles of shoreline. The base is approximately 2.4 miles long between Wells Road (R-91) to Banyan Road (R-102). Option A is 0.4 mile segment between Miraflores Dr. (R-89) to Wells Road (R-91). Lastly, Option B is a 1.6 mile segment from 300 feet north of R-119 to R-127. The primary sand source is one mile offshore of Singer Island which is about 5.8 miles north of Mid-Town segment and 11.6 miles north of Phipps Ocean Park.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents