Similar Projects
SE 8th Court Drainage Improvements
Bidding
$220,431 est. value
Delray Beach, FL

Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Shore Protection Project (SPP) Mid-Town Segment and Phipps Ocean Park (Reach 7) Beach Renourishment 2019
Post-Bid
$10,000,000 to $25,000,000 est. value
Palm Beach, FL 33404

Osceola Park Neighborhood Improvements (Phase II)
Post-Bid
Delray Beach, FL

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Shore Protection Project Jupiter Carlin Segment Beach Renourishment, Palm Beach County, Florida
Results
$10,000,000 to $15,000,000 est. value
Jupiter, FL

Bypass Culvert and Dike Repairs
Bidding
West Palm Beach, FL

Original Section Drainage Improvements Phase 7
Post-Bid
$250,000 est. value
Greenacres, FL 33463

Wildflower Sewall Replacement
Results
Less than $1,550,000 est. value
Boca Raton, FL 33432

Construction and Installation of a Fully Functional Culvert Outfall System within the Lake Worth Drainage District E-1W-S Canal
Results
Delray Beach, FL 33484

Osceola Park Neighborhood Improvements (Phase 1)
Results
Less than $5,000,000 est. value
Delray Beach, FL 33444

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Stormwater Retaining Wall and Drainage Improvements
Results
FL 33469

Original Section Drainage Improvements Phase 6
Results
Greenacres, FL 33463

STA-1E Western Flow-Way Modifications - Imported Soil
Results
Less than $30,000,000 est. value
West Palm Beach, FL 33406

Last Updated 04/05/2021 12:34 AM
Project Title

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33401   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The objective of the project is to use an innovative treatment technology that is suitable, reliable and cost-effective and will remove Phosphorus (TP) from the C-59 Canal's water column, with target operation period of three years

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents