Similar Projects
Miscellaneous Construction - Sheet Pile Wall on A1A
Infrastructure
Bidding
$1,664,863 est. value
North Palm Beach, FL

Central Everglades Planning Project (CEPP) Contract 11A, EAA A-2 Reservoir Foundation & Cutoff Wall
Alteration
Bidding
$250,000,000 to $500,000,000 est. value
Belle Glade, FL

Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project
Post-Bid
$100,000,000 to $250,000,000 est. value
Palm Beach, FL

Vehicle Service Road Relocation
Post-Bid
$500,000 est. value
Palm Beach, FL

Wildflower Sewall Replacement
Results
Less than $1,550,000 est. value
Boca Raton, FL 33432

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Results
Less than $3,000,000 est. value
West Palm Beach, FL 33401

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

STA 1W Expansion #2
Results
$96,180,800 to $106,305,100 est. value
FL

Pinetree Drive and Tequesta Bridge Drainage Improvements
Results
Less than $120,771 est. value
Tequesta, FL 33469

Currie Park Drainage Improvements
Results
$550,000 est. value
West Palm Beach, FL 33407

STA-1W Refurbishments
Results
$18,441,000 to $20,344,000 est. value
West Palm Beach, FL 33406

Annual Drainage Infrastructure Inspection, Cleaning and Repair Contract
Results
Wellington, FL 33414

STA-2 Refurbishments
Results
$35,804,000 to $39,479,000 est. value
West Palm Beach, FL

Last Updated 11/29/2021 02:12 PM
Project Title

S-135 Bypass Culvert and Dike Repairs

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,142,200 to $2,361,776
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves repair of two 96" diameter Corrugated Metal Pipe (CMP) culverts under the Herbert Hoover Dike at the S-135 Pump Station. The project includes the use of a chemical grouting consisting of hydro- insensitive high density poly­urethane polymers (HDPP) injected and pressure controlled through drilled ports that penetrate through the CMP at specified locations access from the culvert's interior. The project also includes installation of a cured-in-place pipe (CIPP) liner inside the two 96” culverts. Site Details: From the East: Travel West on SR-710 (Bee Line Hwy), turn right onto SW Indiantown Ave, then in 0.4 mile turn left onto SW Kanner Hwy (SR 76), in 11 miles take another left onto SW Kanner Hwy, in 250 ft turn left onto SW Conners Hwy (US-441), then in 8.2 miles turn left onto SW Wood St. In 0.5 miles park and wait at the gate to allow entry. From the West: Travel East on SR-710 (Bee Line Hwy), turn right onto CR 15A, in 0.9 mile turn left onto SW Conners Hwy US-441, then in 8.2 miles turn right onto SW Wood Street. In 0.5 miles park and wait at the gate to allow en­try.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents