Similar Projects
Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Shore Protection Project (SPP) Mid-Town Segment and Phipps Ocean Park (Reach 7) Beach Renourishment 2019
Post-Bid
$10,000,000 to $25,000,000 est. value
Palm Beach, FL 33404

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Post-Bid
Less than $3,000,000 est. value
West Palm Beach, FL 33401

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Shore Protection Project Jupiter Carlin Segment Beach Renourishment, Palm Beach County, Florida
Results
$10,000,000 to $15,000,000 est. value
Jupiter, FL

Osceola Park Neighborhood Improvements (Phase II)
Post-Bid
Delray Beach, FL

Wildflower Sewall Replacement
Results
Less than $1,550,000 est. value
Boca Raton, FL 33432

Original Section Drainage Improvements Phase 7
Post-Bid
$250,000 est. value
Greenacres, FL 33463

CEPP New Waters STA-2 Distribution Canal Clearing, Grubbing and Muck Removal
Results
$2,532,000 to $2,799,000 est. value
West Palm Beach, FL 33406

SE 8th Court Drainage Improvements
Post-Bid
$220,431 est. value
Delray Beach, FL

Construction and Installation of a Fully Functional Culvert Outfall System within the Lake Worth Drainage District E-1W-S Canal
Results
Delray Beach, FL 33484

Osceola Park Neighborhood Improvements (Phase 1)
Results
Less than $5,000,000 est. value
Delray Beach, FL 33444

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Stormwater Retaining Wall and Drainage Improvements
Results
FL 33469

Original Section Drainage Improvements Phase 6
Results
Greenacres, FL 33463

Reported 10/13/2020 08:48 PM
Project Title

Currie Park Drainage Improvements

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33407   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to furnish and assume full responsibility for all labor, material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit to replace the exfiltration trench system with a bio-swale detention area and a stormwater drainage system; and to also replace an existing 4" water main with the installation of an 8" DIP water main

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents