Similar Projects
Last Updated | 07/09/2020 09:39 AM |
Project Title | Akron Fulton Airport Runway 7-25 Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Akron, OH 44308 (Summit County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Runways/Taxiways |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $7,082,991 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is for the rehabilitation of Runway 7-25 by mill and overlay, replacement of non-standard structures within the safety area, lighting for Runway 7/25 which includes replacement of lighting to MIRL LED, location signs, and vault upgrades. The project also includes crack repairs, isolated pavement repairs, drainage structure replacement and isolated pavement grading. There will also be milling and overlay of the connector taxiways within the safety area. The crosswind Runway 1-19 will also be decommissioned at the end of the construction project requiring associated decom-missioning of electrical signage and lighting, including removal of markings. The pavement of Runway 1-19 will be removed within the safety area of Runway 7/25. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |