Similar Projects
Last Updated | 04/20/2020 12:18 PM |
Project Title | Engineering Services |
Physical Address | View project details and contacts |
City, State (County) | AL (Mobile County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will install cured-in-place pipe in the sanitary sewer collection system on Stauffer and North Courtaulds Street in Shelton Beach Estates in the City of Saraland, Mobile County. The level and scope of services to be provided by the engineering firm will be determined by the Board of Water and Sewer Commissioners of the City of Saraland. Engineering services for all stages of design, bidding and construction of the project are required. Examples of services which firm must be prepared and qualified to provide shall include but not be limited to the following: The preparation of all necessary construction plans and specifications, the preparation of all bid documents and supervision of the bidding process that is consistent with Local, State and Federal regulations, the provision of on-site resident inspection services during the construction process in addition to regular progress reports to the Board. At the completion of construction, the project engineer shall conduct a final construction inspection and issue a final certificate of completion. As-built drawings shall be delivered to the Board. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |