Similar Projects
Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Signal Replacement - TH 35E
Infrastructure
Conception
$800,000 CJ est. value
Little Canada, MN 55117

Maplewood Assisted Living
New Construction, Infrastructure - 17,233 SF
Design
$4,600,000 CJ est. value
Maplewood, MN 55109

Spring Break - 80-Themed Restaurant and Bar / St. Paul
New Construction, Infrastructure
Design
$935,000 CJ est. value
Saint Paul, MN 55101

Excelsior Interceptor 7017-2 (L20 to L19) and Forcemain 7017 Rehabilitation
Infrastructure
Bidding
$400,000 CJ est. value
Saint Paul, MN 55107

Creative Arts School ARP HVAC Upgrades
Renovation
Bidding
$280,000 CJ est. value
Saint Paul, MN 55101

Hydro Vacuum Excavation Services 2022
Infrastructure
Post-Bid
Falcon Heights, Lauderdale, Maplewood, Mendota Heights, Saint Paul, West Saint Paul, MN

District Center 2022 Renovation
Renovation
Post-Bid
$800,000 est. value
Shoreview, MN 55126

Building Demolition and Site Restoration
Demolition, Infrastructure
Results
White Bear Lake, MN 55110

Gateway State Trail L'Orient Realignment
Infrastructure
Results
$600,000 est. value
Saint Paul, MN

North High School Addition and Renovation
Renovation, Addition
Construction
$21,000,000 est. value
Saint Paul, MN 55109

Twin Lakes Station Demolition and Sitework
Demolition, Infrastructure
Construction
Roseville, MN 55113

Riversedge - Phase 2
New Construction, Infrastructure
Pending Verification
$220,000,000 CJ est. value
Saint Paul, MN 55102

Rice Creek Commons
New Construction, Infrastructure - 1,400,000 SF
Pending Verification
$750,000,000 CJ est. value
Arden Hills, MN 55112

Rice Street Reconstruction - PW16.06 - City of Maplewood
Infrastructure
Conception
$520,000 CJ est. value
Falcon Heights, MN 55113

Last Updated 04/01/2023 10:32 AM
Project Title

White Bear Lake Area Schools - Central Middle School Addition and Renovation

Physical Address View project details and contacts
City, State (County) White Bear Lake, MN 55110   (Ramsey County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $7,162,868 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Approx. Const. Value $24,630,785 All bids shall be on a lump sum basis. No bid may be withdrawn for a period of 60 days after bid receipt without consent of the Owner. Each bidder shall accompany the Bid Form with a bid security as described in the Instructions to Bidders. The Owner reserves the right to reject any or all bids and to waive any irregularities in bids. This project is a multiphase and multi-year project that starts summer 2023 and is to be completed summer 2025. Project involves the construction of new gym that will also serve as the school's storm shelter, renovations of existing classrooms and offices, remodel of kitchen and cafeteria, and HVAC upgrades that include adding dehumidification throughout the building. Direct communications regarding this Project to the office of the Construction Manager: Kent Henry (kent.henry@krausanderson.com) Kraus-Anderson Construction, 501 South 8th Street, Minneapolis, MN 55404; Tel: 612-719-1026. Bidding Documents will be available for inspection at the office of the Construction Manager and the office of the Architect: Wold Architects; and Franz Reprographics. Bidding Documents will be available for inspection at the office of the Construction Manager and the office of the Archit Bid Results: Work Scope 08-A Doors Frames & Hardware - Material Only Twin City Hardware Company $171,000.00 Work Scope 09-D Flooring Floors by Beckers,LLC $619,205.00 Work Scope 23-B Combined Mechanical Weidner Plumbing & Heating Co $10,062,000.00 Work Scope 21-A Fire Suppression Summit Fire Protection Co. $429,000.00 Work Scope 07-H Roofing Berwald Roofing Company, Inc $589,030.00 Work Scope 03-B Structral Precast Taracon Precast,LLC $1,194,286.00 Work Scope 11-K Gymnasium Equipment H&B Specialized Products, Inc $89,450.00 Work Scope 09-A Drywall Commercial Drywall,Inc. $904,900.00 Work Scope 06-A Carpentry Meisinger Construction Company, Inc $1,138,000.00 Work Scope 31-A Site Clearing & Earthwork Arnt Construction Company Inc.$373,560.00 Work Scope 08-A Doors Frames & Hardware - Material Only Twin City Hardware Company $171,000.00 Work Scope 06-D Architectural Millwork Stevens Insustries,Inc $259,214.00 Work Scope 09-F Wood Flooring H2I Group, Inc $128,445.00 Work Scope 11-F Food Service Boelter, LLC $1,188,000.00 Work Scope 08-D Specialty Doors DOORCO, Inc $68,716.00

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents