Similar Projects
S207--Pest Control Services
Term Contract
Design
Fresno, Merced, Oakhurst, Tulare, CA 93703

S207--Pest Control Services
Term Contract
Design
Fresno, Merced, Oakhurst, Tulare, CA 93703

Job Order Contract 2021 - General Construction
Alteration
Bidding
Less than $1,000,000 est. value
CA

Landscape Maintenance San Leandro
Infrastructure
Bidding
San Leandro, CA

On-Call Tree Maintenance Services
Infrastructure
Post-Bid
$1,800,000 est. value
Oakland, CA

On-Call Citywide Bicycle Parking Installation and Maintenance
Alteration
Post-Bid
$330,000 est. value
Berkeley, CA

Fire Department Project Management & Consulting
Alteration
Results
Berkeley, CA

On-Call Water Engineering Consulting
Term Contract
Results
Vallejo, CA

Citywide as-Needed Repair Services
New Construction
Bidding
$10,000,000 CJ est. value
Santa Clara, CA

Highway Safety Improvement Program Cycle 8 - HSIPC8
Alteration
Post-Bid
$521,283 est. value
Oakland, CA

Placer County - Fire Sprinkler System Inspection, Testing and Maintenance
Alteration
Results
Auburn, CA

Regional Specialty Roofing Job Order Contract
Alteration
Bidding
$500,000 est. value
Long Beach, CA

County of Placer - Elevator and Chairlift Inspection, Testing, Maintenance, and Repair Services
Alteration
Post-Bid
CA

Monthly Pest Control Services at The Stockton Driver Safety Office
Alteration
Bidding
Stockton, CA 95202

Portable and Vault Toilets Services and Rentals
Term Contract
Post-Bid
San Francisco, CA

Last Updated 08/31/2021 05:31 PM
Project Title

RCD Elevator Modernization

Physical Address View project details and contacts
City, State (County) Oakland, CA 94612   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Duration: 730 Calendar Days All work must be completed within two years from the notice to proceed. Milestones: 1. Contractor shall modernize one elevator at a time. The jail elevator must be completed within 1 year (365 Calendar Days) of the notice to proceed. The Contractor shall furnish all labor, materials, parts, equipment, and incidentals necessary for the complete modernization of the existing five (5) electric traction elevators located at 1225 Fallon Street in Oakland, including four (4) passenger elevators and one (1) jail elevator. Destination dispatch controls are required the modernization packages for all Passenger Elevators.

Details

Division 14 - Conveying Equipment, Elevators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents