Similar Projects
Bethel Avenues Piped Water and Sewer Project
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Bethel, AK 99559

Big Lake and Butte Elementary School Water System Upgrades
Infrastructure
Results
$1,030,000 est. value
Big Lake, AK

Port Of Alaska Utility Locates
Alteration
Post-Bid
Less than $50,000 est. value
Anchorage, AK

FY23-25 Domestic Water System Backflow Certification and Testing - 3-Year Maintenance Contract
Term Contract
Post-Bid
Unalaska, AK

Orca HDPE Water Rehabilitation
Infrastructure
Post-Bid
$50,001 to $500,000 est. value
Anchorage, AK

Wharf Heat Trace Modifications Design Build Services
Alteration
Results
Anchorage, AK

Contractor - Port of Nome Modification Phase 1
Infrastructure
Design
$180,000,000 to $200,000,000 est. value
Nome, AK

Talkeetna Service Line Repair
Infrastructure
Post-Bid
Talkeetna, AK 99676

Ouzinkie Arctic Pipe
Infrastructure
Post-Bid
$175,000 to $180,000 est. value
Anchorage, AK

Pioneer Park Water Supply Distribution
Infrastructure
Post-Bid
Fairbanks, AK

Water Sewer Replacement
Infrastructure
Conception
Kotzebue, AK

RFQ D/B - Refuge Faunique National Izembek Design Build Services
Renovation, Infrastructure
Design
$10,000,000 est. value
Healy, AK

Reported 06/29/2022 12:00 AM
Project Title

Utilities for Temporary Facilities (Bldg 21309)

Physical Address View project details and contacts
City, State (County) Anchorage, AK   (Anchorage County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT LOCATION: Joint Base Elmendorf-Richardson (JBER) is located on the northern edge of Anchorage, Alaska and is accessible from the Glenn Highway at Boniface Parkway. The project location is on the Elmendorf side of the installation in Bldg 21309 compound. Project is to provide building skirting, gas service lines, concrete bollards, furnace conversion, power service, and ground connection for two THQ buildings. 1.3.1 Skirting 1.3.1.1 Must be installed per the manufacturer's installation or, if the manufacturer is not specific, to the standards in this section. It must be vented to allow access to the under-floor area per the manufacturer's installation instructions. 1.3.1.2 Skirting must be of materials suitable for ground contact. Metal fasteners must be galvanized, stainless steel or other corrosion-resistant material. Ferrous metal members in contact with the earth, other than those that are galvanized or stainless steel, must be coated with an asphaltic emulsion. 1.3.1.3 Skirting must not be attached in such a manner that can cause water to be trapped between the skirting and siding or trim. The skirting must be recessed behind the siding or trim. 1.3.1.4 Crawl space to be ventilated in accordance 2018 IBC 1202.4. Install so as to provide cross-ventilation of crawl space. 1.3.1.5 Install lockable 30in X 30in panel in skirting. The cover must be of metal, pressure-treated wood or vinyl. 1.3.1.6 Skirting shall be 29 gauge metal skirting with 4 inch rigid insulation as shown on as-builts (sheet A-4). 1.3.2 Furnace 1.3.2.1 Furnaces have been converted to run on Liquid Propane and shall be converted to run on natural gas. 1.3.2.2 Furnaces shall be cleaned, serviced, tested, with new air filters installed, and operated to ensure proper efficient operation, according to manufacturer. 1.3.3 Natural Gas Service 1.3.3.1 All installations shall meet State, Federal codes, and section 23 11 20 Facility Gas Piping specification. 1.3.3.2 Gas service shall be supplied to each modular building placed on the site. 1.3.4 Electrical Service 1.3.4.1 Underground service from existing transformer to two THQ buildings. 1.3.4.2 Post mounted service equipment. 1.3.4.3 Grounding electrode system. All underground grounding connections shall be exothermic weld. 1.3.4.4 Electrical system installation shall be in accordance with drawing E1 and E2 1.3.4.5 Insulation testing for all underground feeder conductors. 1.3.5 Restore disturbed surfaces to original conditions including paved asphalt, concrete, and top soil/seed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents