Reported 04/24/2020 12:00 AM
Project Title

National Guard Bureau, Region 3, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Horizontal Projects

Physical Address View project details and contacts
City, State (County) State-Wide: AZ, CO, IL, NM, NV, UT, WI
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $100,000 to $90,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Anticipated A-E services for Region 3 may include but are not be limited to performance of planning, master planning, and program support; A-E investigative and design services including development of construction documents; construction support; engineering and environmental studies, National Environmental Policy Act (NEPA) documentation; investigations and surveys in support of the Air and Army National Guard Programs. Typical work may include, but is not specifically limited to: A: the preparation of plans, specifications, calculations, and cost estimates; B: the development of cost management, quality control and quality assurance plans; C: construction inspection, testing and management services; D: development of engineering standards; E: preparations for design submissions; F: technical, economic, planning, environmental, value engineering and other studies, analyses, surveys, investigations, and reports; G: development of performance criteria for bridging documents for design build projects; H: development of documents to support various government construction programs. Services may also include, but are not limited to, a wide variety of professional services in support of projects for administrative, industrial, and support facilities to meet the needs of the National Guard. Various projects may include services associated with National Guard installations/facilities, such as Pavements to include Airfield, Roads, parking lots and Sidewalks, Utilities (Water, Sewer, Electrical, Natural Gas, Storm Drainage), running tracks, Fencing and gates, Exterior lighting for parking and airfields, Oil Water Separators, Automated Record Fire Ranges, Gunnery Complex, Clear Zones, Bridges, Generator connections for facilities, Smart Meters, Barriers, Lightning Protection Systems, Reservoirs, Fall Protection Fire Loops, Fuel systems and other support facilities. Additionally, task orders may be issued for support services which require A-E Services as defined in FAR 2.101.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents