Similar Projects
Reported | 05/21/2020 12:00 AM |
Project Title | 2021 Presidential Inaugural Sound System |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20001 (District of Columbia County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of Requirements: The AOC has a requirement for services to include the rental, installation, operation, and removal of a Sound System for the 2021 Presidential Inauguration at the West Front of the United States Capitol Building. The sound system shall be installed per the contract documents to provide high level reinforcement for speech and entertainment. The sound system shall be operational no later than 3:00 PM local time in Washington D.C. on January 10, 2021. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |