Similar Projects
Jesters Creek East Outfall Replacement - Phase 2
Infrastructure
Bidding
Forest Park, Jonesboro, GA 30236

2019 CDBG - Street and Drainage Improvements
Infrastructure
Bidding
$1,500,000 est. value
Camilla, GA

Southbridge Infrastructure Improvements
Post-Bid
GA

Beechwood Circle Drainage Replacement
Post-Bid
Lawrenceville, GA 30046

Walking Trail at Meridian Park
Results
Loganville, GA 30655

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Kipp Vision Modular Health Clinic
New Construction
Construction
Atlanta, GA 30315

Commercial Properties Re-Development
Infrastructure
Bidding
Morrow, GA 30260

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Site Prep for Pre-Fab Restrooms
Results
Ellenwood, GA 30294

Ariston Retail - Civil Package
New Construction, Infrastructure
Construction
Buford, GA 30519

Fraction Bottoms Road Culvert Replacement
Infrastructure
Bidding
Buckhead, GA 30625

CDBG Engineering Services
Post-Bid
Alma, GA

Whitfield Street Drainage Improvements
Results
Smyrna, GA

Reported 12/17/2021 12:00 AM
Project Title

Supplemental Drain - Thomaston Mills Reservoir Dam

Physical Address View project details and contacts
City, State (County) Thomaston, GA   (Upson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project consists of (but is not limited to) grading and subsurface drainage improvements to address seepage near the Thomaston Mills Reservoir dam. This project includes excavation into the downstream toe and abutment of an existing dam to construct a subsurface drainage system. The proposed drainage system will be comprised of a blanket and trench drains as well as a series of collector and outlet pipes at the toe of the subject dam as a means to control seepage. Also included are erosion control, monitoring well modifications, and all other ancillary items for a complete and functional project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Excavation and Fill, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents