Similar Projects
Highlander Park Aquatic Complex
New Construction, Infrastructure
Conception
Dunedin, FL 34698

Schooner Resort Hotel
New Construction, Build-Out, Demolition
Design
Madeira Beach, FL

Gateway Project - Artisan East Apartments
New Construction - 17,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Dunedin, FL 33755

Replace Pool Marcite Finish at USCG Air Station Clearwater
Post-Bid
$30,000 est. value
Clearwater, FL 33762

Southwest Recreation Complex Pool Dive Tower Reconstruction
Infrastructure
Post-Bid
$175,000 est. value
Largo, FL 33774

JW Marriott Clearwater Beach Resort & Spa
New Construction, Demolition - 391,059 SF
Construction
$130,000,000 est. value
Clearwater, FL 33767

Hampton Inn
New Construction - 56,107 SF
Construction
$3,780,000 est. value
Pinellas Park, FL 33781

Miramar Beach Resort
New Construction - 47,170 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Saint Pete Beach, FL 33706

The Grand Plaza Hotel & The Beachcomber Beach Resort Hotel
Renovation
Pending Verification
Saint Pete Beach, FL 33706

Harbor View
New Construction
Design
Clearwater, FL 33767

Lake Maggiore Apartments
New Construction - 1,980,000 SF
Post-Bid
Saint Petersburg, FL 33705

Ascent St. Petersburg
New Construction, Build-Out
Construction
$117,000,000 est. value
Saint Petersburg, FL 33701

405 Coronado Drive
New Construction
Pending Verification
Clearwater, FL 33767

The Cordova Inn
Addition - 38,200 SF
Design
Saint Petersburg, FL 33701

AC Marriott
New Construction - 182,690 SF
Construction
$25,000,000 est. value
Clearwater, FL 33767

Reported 12/23/2021 12:00 AM
Project Title

Hampton Inn

Physical Address View project details and contacts
City, State (County) Madeira Beach, FL 33708   (Pinellas County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Beach Facility/Marina, Hotel/Motel, Swimming Pool(s)
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Hotel/Motel, 6 Stories Above Grade, 112,300 SF New Construction, 130 Unit(s), New Construction, 216 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Access Control, Security Access Detection.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents