Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Residence Inn by Marriott / Cedar Falls
New Construction, Infrastructure - 21,530 SF
Design
$6,500,000 CJ est. value
Cedar Falls, IA 50613

Wood Street Reconstruction
Infrastructure
Bidding
$500,000 CJ est. value
Hudson, IA 50643

HMA Resurfacing - U.S. 20, Iowa 27
Infrastructure
Bidding
$1,500,000 CJ est. value
Waterloo, IA 50701

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

Hydrite Chemical Company - Private Roadway BP1
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Waterloo, IA 50703

Cedar Falls West Viking Road Industrial Park Phase V
Addition, Infrastructure - 180,675 SF
Results
Cedar Falls, IA 50613

HCC @ Techworks ReBid
New Construction, Infrastructure
Results
$75,475 CJ est. value
Waterloo, IA 50701

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Gibson Property Development - Phase I - 2 - City of Cedar Falls
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Cedar Falls, IA 50613

Tiger Performance Center - Cedar Falls Community Schools
New Construction, Infrastructure - 85,500 SF
Design
$9,000,000 CJ est. value
Cedar Falls, IA 50613

FY 2023 Greenbelt Lake Reap Grant Phase II
New Construction, Infrastructure - 560 SF
Bidding
$240,000 CJ est. value
Waterloo, IA 50701

Last Updated 05/12/2023 09:10 AM
Project Title

High School Renovation and Addition

Physical Address View project details and contacts
City, State (County) Hudson, IA 50643   (Black Hawk County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $13,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Masonry addition to the west side of the high school consisting of a competition gymnasium, locker rooms, administrative offices, and CTE space. The renovations include new ceilings, lights, flooring, painting, windows, and HVAC heat pumps. Renovations to the current media center to become 3 Innova-tive Classrooms, and other related work as indicated in the drawings and specifications. The project is located at 245 S Washington St, Hudson, IA 50643 1. Furnish and install all required materials to provide a complete system per the Specification Sections included in each Bid Package. 2. All work in this bid package shall be provided in accordance with applicable state and local codes. 3. Provide all layout as required to complete this scope of work. 4. Each bid package is responsible for replacing/repairing anything they damage such as footings, anchor bolt settings, paving, polished concrete floors, and other building components, etc. 5. Each prime contractor is responsible to supervise any and all subcontractors under that specific bid package. 6. Provide daily jobsite clean-up. Contractor shall be required to keep the building site and surrounding areas clean of their construction debris, on a daily basis. Good housekeeping and jobsite cleanliness is a must. Haul all non-hazardous debris to dumpster provided by Construction Manager. Contractor shall be required to thoroughly clean building area and site upon completion of contract work prior to close-out and final payment. It is the Prime Contractor's responsibility for disposal of all their own hazardous waste and excess materials. 7. Assume full responsibility for protection and safekeeping of products, materials, and equipment to be installed under this contract throughout construction until building turnover. Contractor is also responsible for protection and safekeeping of own tools, equipment, office trailer, etc. 8. All contractors responsible for all hoisting, scaffolding, unloading, storing, security, material handling equipment, temporary protection, enclosure protection, rigging and final placement of material and equipment supplied under this scope. This also includes the unloading of delivery vehicles. 9. All contractors agree to perform any premium time or shift work necessary to maintain the construction schedule. If the delay is caused by this contractor, the expense shall be paid by this contractor. If the delay is caused by others, the expense shall be paid by others. NO additional costs will be incurred by the project. 10. Firestopping for entire project to be provided by Bid Package #4 General Construction. 11. All contractors acknowledge the required PPE on the project includes, but is not limited to the following items: a. Hard Hats. b. Hard sole, hard toed shoes or boots, with leather uppers. c. Shirts with minimum three (3) inches over the shoulder sleeves (no tank tops or sleeveless shirts). d. Long sleeves shall be required when welding. e. Full length trousers shall be worn at all times, no exceptions (no shorts or cutoffs). f. Full face protection where required or posted, i.e., grinding, burning, etc. g. Ear and eye protection when required in area so posted. h. Fall protection when required. i. Air packs or proper ventilation for breathable air when and where require 12. Testing services will be provided by the Construction Manager. Installing contractor shall cooperate and coordinate the testing with the Testing Agency. Additional testing resulting from non conformance or deficiencies are the responsibility of the installing contractor. 13. Protect finish floors from oil, grease, and damage. No threading or cutting machines will be allowed on a finish floor surface. Any lifts on a finish floor surface shall use non-marking tires and ensure no leaks come from equipment, otherwise protection of the floor must be in place prior to using lifts on a finish floor surface. Finish floors include polished concrete and sealed concrete floors. 14. General temporary lighting will be provided by the Electrical Prime Contractor. Additional temporary or task lighting and power distribution will need to be provided by each prime contractor. 15. Prime Contractor shall provide, at their own expense, the following temporary facilities and construction measures for personnel and environmental protection: a. Drinking water. b. First aide supplies. c. Fire Extinguishers for fighting special combustible material. d. Barricades, warning signs and lights. e. Environmental protection. f. Back-up alarms on all moving equipment. g. Temporary office trailer/storage vans and/or tool storage. 16. Prime Contractor is responsible to remove all of their temporary facilities, excess construction materials and equipment, and leave the area in which work is accomplished, clean and in satisfactory condition and repair. 17. If work might expose the jobsite to hazardous chemicals, Prime Contractor shall submit written notification of the hazardous chemicals and proper safety precautions. This notification shall be done prior to any work starting. Further, Prime Contractors are responsible for training their employees on hazardous materials per Federal and State of Iowa "Right To Know" regulations and standards. a. Prime Contractor shall control storage, dispensing, and disposal of empty containers under EPA and OSHA guidelines. b. No hazardous materials can be brought on site without proper submittal of SDS data sheets and written permission from the Construction Manager. 18. Prime Contractor shall be required to strictly control any and all hazardous materials as defined by OSHA and EPA. 19. Prime Contractor will be required to have an on-site, trained, competent first aide person and an identified first aide station. will then be acted on by the Board of Education at their meeting on the 17th day of May 2023 at 5:00 p.m. for their consideration and action. Board meetings will all be held in the Hudson Schools District Office at 136 S Washington St., in said City

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents