Similar Projects
Tree Haus Bridge Painting
Bidding
Steamboat Springs, CO

On-Call Painting Projects - Countywide
Term Contract
Bidding
Brighton, CO

Painting and Fencing On-Call Single Trade Services
Post-Bid
Denver, CO 80202

Filter Coating
Post-Bid
Arvada, CO 80007

Paint For Bldgs: 68, 69, 70, 71 & 105 - Golden, Co
Results
Less than $56,000 est. value
Lakewood, CO

Island Grove Arena Painting
Results
Greeley, CO 80631

5.0 Mg West Red Zone Tank Repainting
Post-Bid
Lafayette, CO

Recreation Lighting and Painting Projects
Results
Greeley, CO

Interior and Exterior Paint Bid
Term Contract
Post-Bid
Colorado Springs, CO 80906

Annual Maintenance - Interior Painting
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Hill Hall Exterior Painting
Post-Bid
Glenwood Springs, CO

As-Needed Painting and Drywall Services
Term Contract
Results
Aspen, Carbondale, Glenwood Springs, Parachute, Snowmass, CO

Paint Project Mount View Youth Center
Post-Bid
Denver, CO 80235

Welded Steel Tank Interior Recoating
Results
Less than $300,000 est. value
Buena Vista, CO 81211

As-Needed Painting Finishing Services
Term Contract
Post-Bid
Aspen, CO 81611

Reported 03/17/2020 12:00 AM
Project Title

Multiple Facility Painting Requirement Schriever AFB Painting IDIQ

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $4,000,000 to $6,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Schriever Air Force Base is located approximately 15 miles East of Colorado Springs, with a majority of facilities and infrastructure having been built in the 1980s and 1990s. Existing facility paint color schemes do not meet the current Installation Facilities Standards (IFS). Additionally paint and protective coatings throughout the base at the end of their lifecycle, diminishing the life-span of infrastructure and making it vulnerable to the elements. This contract aims to repair, maintain, or provide protective coatings for Real Property Installed Equipment (RPIE) to extend expected service life.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents