Similar Projects
Fleet Facility Expansion/Renovation - City of New Britain
New Construction, Renovation
Conception
New Britain, CT 06051

Firehouse #5 Upgrades - City of Hartford
Renovation
Conception
$3,506,000 est. value
Hartford, CT

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Bidding
$4,000,000 CJ est. value
Hartford, CT 06103

RFQ Engineering - Drinking Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
New Britain, CT 06051

The Spark - 690 Cedar Street Apartments
New Construction, Infrastructure - 364,669 SF
Post-Bid
$55,000,000 CJ est. value
Newington, CT 06111

New Horizons Addition
New Construction
Post-Bid
Farmington, CT 06085

Construction Services for Police Station Locker Room Renovations
Renovation
Results
Manchester, CT 06040

Police Department Locker Room Renovations
Renovation
Results
South Windsor, CT 06074

Kings Ridge
New Construction
Construction
Southington, CT 06489

O'Reilly Auto Parts (ENF) #6484 / Enfield
New Construction, Infrastructure - 7,250 SF
Construction
$1,900,000 CJ est. value
Enfield, CT 06082

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

Loukopoulos Building E
New Construction, Infrastructure - 12,600 SF
Pending Verification
$2,500,000 CJ est. value
Southington, CT 06489

Training Facility Renovations - City of Hartford
Renovation
Conception
$6,020,000 est. value
Hartford, CT 06103

Last Updated 03/14/2023 03:11 PM
Project Title

RFP Construction Manager at Risk - Town of Windsor Locks Police Headquarters and Senior Center

Physical Address View project details and contacts
City, State (County) Windsor Locks, CT 06096   (Hartford County)
Category(s) Government/Public, Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Project In For Redesign, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $28,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.mdjonline.com/tribune/regional/smaller-footprint-needed-for-windsor-locks-senior-center-police-station/article_1a775855-5351-54f6-87b5-1337667a1d36.html Design changes for the new senior center and police station to be built on Spring Street, which have come in over budget, should help bring estimates for the project closer to expectations, First Selectman Paul Harrington said this week. Residents approved the two building projects, proposed for 291-519 Spring St., in March. Voters gave their approval to spend up _________________________________________________________ As of November 23, 2022, project is back in design as estimates received on CMAR proposals came in over budget. Project will likely rebid spring 2023. The Town of Windsor Locks, Board of Selectmen, hereafter referred to as "Owner", is requesting proposals for professional construction manager at risk services for a new +/-22,000 s.f. Police Headquarters and +/-17, 550 s.f. Senior Center proposed to be built on land available on Spring Street, Windsor Locks, CT, hereafter referred to as "the Project". The primary goal of the Project is to provide complete oversight and construction management of the Project to ensure that the Project is delivered to the Owner on time and within the funding appropriation previously allocated by voters of the Town of Windsor Locks. The CM@R must submit a proposed Project schedule. The proposed schedule is to include the following minimum activities: a listing of required permits, preconstruction activities, Owner required items (i.e. approve design phases and budget, approve FF&E...), duration of schematic design and cost estimate, 100% design development and cost estimate, 90% construction documents and cost estimate, bid phase, award, Notice to Proceed date, both overall construction duration and location/ phase construction duration. The Town of Windsor Locks reserves the right to reject any or all of the proposals submitted. The Town of Windsor Locks reserves the right to negotiate the cost of this proposal and to award the work to a firm other than the firm with the lowest cost, if it is in the best interest of the Town.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents