Similar Projects
Montfort Drive Paving and Drainage Improvements
Bidding
Dallas, TX 75295

Reconstruction of Plantation Drive and Mossy Oaks Street
Bidding
$4,798,819 est. value
Coppell, TX 75019

Northcrest Estates Section 3 Street Reconstruction
Post-Bid
Carrollton, TX 75006

Sapphire Bay Resort Hotel, Crystal Lagoon, and Surf Park - Marina Road, Public Boat Ramp, and Public Utilities - Lake Ray Hubbard
Post-Bid
Rowlett, TX 75088

Southern Region Disaster Recovery Support BPA
Results

Total Routine Maintenance of President George Bush Turnpike (West) and Mountain Creek Lake Bridge
Term Contract
Results
$48,787,200 est. value
Grand Prairie, TX

Alley Reconstruction Group 17-1203
Bidding
Dallas, TX 75248

DNT and SRT Concrete Pavement Joint and Crack Sealing
Post-Bid
Coppell, TX 75019

Addison Town Hall Drive and Lake Forrest Drive Pavement Replacement
Results
Dallas, TX 75254

Paving Improvements for Galloway Place Neighborhood and Northridge Addition Repairs
Bidding
$1,200,000 est. value
Mesquite, TX

Paving and Drainage Improvements for Pearl Street from Pacific Avenue to Live Oak Street - PB06U798
Post-Bid
Dallas, TX 75201

Bond 36 - Month Street Resurfacing and Street Improvements for the 2017 Capital Bond Program
Term Contract
Results
Dallas, TX 75201

Asphalt, Concrete, Patching, Paving and Curbs
Bidding
Carrollton, TX

Vineyard Park Paving Improvements
Post-Bid
Sunnyvale, TX 75182

Alley Reconstruction Group A - CDBG Projects Highland Meadows North 1 & 2 (Shipman-Grant)
Results
$366,900 est. value
Rowlett, TX 75088

Last Updated 03/17/2021 02:41 PM
Project Title

Denton Tap Intersection Improvements

Physical Address View project details and contacts
City, State (County) Coppell, TX 75019   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,777,148
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 4,700 square yards of full-depth pavement for right and left turns lanes, traffic signal improvements, storm sewer inlet relocation, and 1,200 square yards of sidewalk construction at the Denton Tap Road intersections of Southwestern Boulevard, Bethel School Road, Sandy Lake Road, and Parkway Boulevard. Additionally, this work also includes the improvements to vehicle detection systems at various intersections throughout the City (27 intersections).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents