Similar Projects
Wastewater Treatment Plant - Town of Wakefield
New Construction, Infrastructure
Conception
$1,120,000 CJ est. value
Wakefield, NH 03872

Community Center Building - Town of Wakefield
Demolition, New Construction, Infrastructure
Conception
$4,900,000 CJ est. value
Wakefield, NH 03872

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Road Maintenance Contract
Term Contract
Post-Bid
Effingham, NH

Street Sweeping
Infrastructure
Post-Bid
Wolfeboro, NH

Maplewood Subdivision Roadway Reconstruction Project
Infrastructure
Results
Wolfeboro, NH 03894

Districts 2 and 3 Resurfacing
Infrastructure
Results
$3,881,637 est. value

Mount Washington Cog Railway - Restaurant & Hotel
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Jackson, NH 03846

Crack Sealing
Infrastructure
Post-Bid
Wolfeboro, NH

Green Mountain Road Paving
Infrastructure
Results
Effingham, NH 03882

Cleared and Leveled With Gravel Then Topped With Stonedust
Infrastructure
Post-Bid
$40,000 CJ est. value
Wakefield, NH 03872

Pavement crack seal on 12 section in Districts III, IV and V
Infrastructure
Results
$545,957 est. value

Statewide Tier 2 Resurfacing (NW)
Infrastructure
Post-Bid
$4,897,125 CJ est. value
Tamworth, NH 03814

Roadway Resurfacing
Infrastructure
Results
$3,720,984 est. value

RFQ/P Construction Manager - Construction Manager Services for Wolfeboro Public Safety Building
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$82,000 CJ est. value
Wolfeboro, NH 03894

Last Updated 03/10/2023 04:36 PM
Project Title

Little Chatham Road Reconstruction

Physical Address View project details and contacts
City, State (County) Center Conway, NH 03813   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $295,995 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves installation of cross culverts, grass-lined ditching, common excavation, hot mix asphalt base and surface paving, and installation of gravel shoulders for approximately 3,220 linear feet on Little Chatham Road. All bidders must furnish the following: 1. A completed Bid Form. 2. Experience Record (see Section 2-D). 3. A list of all subcontractors to be utilized on the project. 4. A bid security in the amount of 5% of the total bid in the form of a Bid Bond or certified check, made out to the Town of Fryeburg. The successful bidder must furnish the following: 1. Certificate of Insurance (in accordance with Section 3, Article 26) 2. 100% Construction Performance Bond 3. 100% Construction Labor and Material Payment Bond The Town of Fryeburg will have one hundred twenty (120) calendar days within which to accept or reject any bid. The work shall be completed by September 15, 2023. Liquidated damages in the amount of $250 per day are contained in the Contract. The Town of Fryeburg reserves the right to adjust the quantities contained in the Bid Form as needed in order to stay within the project budget. The Town of Fryeburg reserves the right to reject any and all bids, to waive any technical or legal deficiencies, and to accept any bid which is deemed to be in the best interest of the Town of Fryeburg, not necessarily the lowest bid.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents