Similar Projects
Floating Dock Materials – Danbury Fire Department
Bidding
Danbury, CT

Z--Design-Build Nautilus Pier Water Taxi Dock, NAVSUBASE New London, CT
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
Groton, CT 06349

Replace/Repair Dock System at Marina
Post-Bid
Danbury, CT 06812

Marine Construction and Maintenance Service
Term Contract
Results
Greenwich, CT

P898, Replace Pier 32 at NAVSUBASE New London, CT
New Construction, Demolition
Results
$25,000,000 to $100,000,000 est. value
Groton, New London, CT 06340

Ferry Slip
Construction
New London, CT

Design-Bid-Build, P1097 Relocate Underwater Electromagnetic Measurement System
Post-Bid
$1,000,000 to $5,000,000 est. value
New London, CT

New London Waterfront Repairs and Maintenance
Results
New London, CT

Nautilus Pier Water Taxi Dock
Post-Bid
Groton, CT 06340

Marine Inspection and Repair Services
Term Contract
Results
Groton, CT

Branford Point Seawall and Wharf Repair
Post-Bid
Branford, CT

Thames River Marina Dock Removal Project
Results
Waterford, CT 06385

Design, Fabrication and Installation Services for Baldwin Bridge State Boat Launch Floating Dock Systems
Post-Bid
Old Saybrook, CT 06475

Construction Manager at-Risk (CMR) for Infrastructure Improvements to Connecticut State Pier
Results
New London, CT 06475

New Business Venture - Waterfront Promenade
Post-Bid
New London, CT

Last Updated 01/03/2020 11:23 AM
Project Title

Annual Servicing of Anchorage Markers and Dock Floats

Physical Address View project details and contacts
City, State (County) Essex, CT   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The bid is to remove, store and re-set and to provide an inspection report with needed repairs and estimate of cost to implement those repairs: Markers: 9 markers (A-J, excluding C) from the main anchorage; 2 markers (A & B) from the Meadows anchorage; Rock obstruction markers. Floats: The float connected to the Main Street Dock; The float and ramp from the Town Park site in Middle Cove; The float and ramp from the Mack Lane site in Middle Cove; Removal of markers and floats to be accomplished after November 15, 2019. Re-setting must be accomplished prior to April 15, 2020, but not earlier than March 15, 2020. Dates to be adjusted in concert with the HMC and the Harbor Master. Marker position in accordance with GPS points maintained by HM

Details

Division 11 - Equipment, Loading Dock Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents