Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

2022 Street Improvements
Infrastructure
Bidding
$538,000 est. value
Corning, IA

1st Avenue East Overlay
Infrastructure
Bidding
$200,000 est. value
Walford, IA 52351

HMA Resurfacing - I-80
Infrastructure
Post-Bid
IA

Carroll Street Restoration - 2022
Infrastructure
Post-Bid
$300,000 est. value
Carroll, IA

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

Adams Court Improvements
Infrastructure
Results
$147,668 est. value
Garnavillo, IA

HMA Resurfacing with Milling
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
West Branch, IA 52358

2022 Street Rehabilitation Program
Infrastructure
Post-Bid
Mason City, IA

Cyber Lane Extension
Infrastructure
Results
Cedar Falls, IA

HMA Resurfacing/ Cold In-Place Recycling
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Aplington, IA 50604

2022 Street Panel and Curb Replacement Program
Infrastructure
Post-Bid
Mason City, IA

2021 Washington Street Improvements
Infrastructure
Results
Less than $248,310 est. value
Exira, IA

UNI Institutional Roads 2022
Infrastructure
Bidding
Cedar Falls, IA

Last Updated 05/30/2022 04:35 AM
Project Title

Main Street - PCC Pavement - Grade and Replace

Physical Address View project details and contacts
City, State (County) Readlyn, IA 50668   (Bremer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In The City Of Readlyn, On Main St, From 4th St South 0.22 Miles To 1st St 11.00 Ton Asphalt Binder 1.00 Lump Sum Construction Survey 341.00 Square Yard Drives, p.c.c. 2,414.00 Cubic Yard Excavation Class 10 26.00 Ton Granular Shoulders, Type b 178.00 Ton Hot Mix Asphalt 11.00 Each Intakes & Manholes/Utility Access 1,673.00 Cubic Yard Modified Subbase 123.00 Station Pavement Markings 8,433.00 Square Yard Pavement, p.c.c. 10,988.00 Square Yard Removal Of Pvmnt/Drives/Sdwk 1,345.00 Linear Foot Sewer, Storm 21.60 Station Shoulder Finishing 2,242.00 Square Yard Sidewalk, p.c.c. 73.40 Square Sodding 2,056.00 Linear Foot Subdrain 136.00 Cubic Yard Topsoil, Strip/Salvage/Spread 1,452.00 Linear Foot Water Main

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents