Similar Projects
Pump Station Wet Well Cleaning Services
Results
Boone, Kenton, KY

Pump Station Wet Well Cleaning Services
Results
Boone, Kenton, KY

Temporary Pumping Services
Post-Bid
Lexington, KY

Pump Services
Results
Less than $53,681 est. value
Erlanger, KY

Vertical Pump for Glacier Run Exhibit
Results
Louisville, KY 40213

On-Call Pump Repairs Stormwater Treatment Plant
Results
Erlanger, KY

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Water Source Heat Pumps
Infrastructure
Bidding
Frankfort, KY

High Service Pump Replacement
Infrastructure
Bidding
McKee, KY

Two (2) High Service Pumps and Motors
Alteration
Post-Bid
Prestonsburg, KY

Richmond Utilities Board - Richmond Utilities Water Rate Study
Infrastructure
Bidding
Richmond, KY

Last Updated 08/16/2021 09:00 AM
Project Title

BGMU Water Treatment Plant High Service Pump No. 4

Physical Address View project details and contacts
City, State (County) Bowling Green, KY   (Warren County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide vertical turbine pump (High Service Pump No. 4) and associated medium-voltage motor and variable frequency drive (VFD) all to be located in a new pre-engineered metal building (PEMB) to be located on top of existing Clearwell No. 6. PEMB shall also house existing High Service Pump No. 5 and its associated motor as well as new electrical equipment to accommodate new and existing facilities. Both new and existing pumps shall be provided with new pump control valves. New discharge piping, valves, and fittings shall be provided for existing pump. Common discharge piping for both pumps shall be modified, including relocation of existing Venturi flow meter and associated heated enclosure. Medium-voltage and low-voltage (480-volt) power shall be extended to the new PEMB from the existing electrical building. Provide all associated civil, process, structural, architectural, mechanical/HVAC, electrical, plumbing, and instrumentation systems required for the new and existing facilities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents