Similar Projects
Mechanical Engineering and Design Services for Annex Hvac System Replacement
Renovation, Term Contract
Bidding
Tacoma, WA 98405

Consultants for West Curlew Lake Culvert Replacement
Term Contract
Bidding

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Electrical Engineering Services
Infrastructure
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Manson Bay Marina Breakwater Replacement Planning
New Construction, Infrastructure
Results
Manson, WA

FAA Airport Traffic Control Tower Design Competition
New Construction
Post-Bid

Pershing and Poplar Sewer Extension
Infrastructure
Results
$950,000 to $1,000,000 est. value
Wenatchee, WA

Rfq Multiple Engineering Service
Term Contract
Post-Bid

Columbia to Sanders Water and Sewer Main Replacement
Infrastructure
Results
$1,300,000 est. value
Chelan, WA 98816

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Request for Qualifications (Architectural and Engineering Services)
Term Contract
Post-Bid

Last Updated 03/29/2022 12:04 PM
Project Title

Peachey Street Basin Water Quality Retrofit

Physical Address View project details and contacts
City, State (County) Wenatchee, WA   (Chelan County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Engineering, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will install a series of Hydrodynamic Separators (HDS), a stormwater filter vault with media filter cartridges, and dry wells at up to four (4) sites to provide pre-treatment meeting requirements of Ecology's Stormwater Management Manual for Eastern Washington (SWMMEW) and City Standards. Construction of the facilities is intended to provide treatment for total suspended solids, heavy metals including copper and zinc, trash and other floatables generally present in stormwater.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents