Similar Projects
Alcovy River Gravity Sewer - City of Monroe
Infrastructure
Conception
$4,000,000 CJ est. value
Monroe, GA 30655

Spring Street Tank 10" Water Main Loop (Tank to CSX Bore on E Hightower) - City of Social Circle
Infrastructure
Conception
$350,000 CJ est. value
Social Circle, GA 30025

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Cap Repairs at the Miller Bottom Road Landfill
Infrastructure
Bidding
$500,000 CJ est. value
Loganville, GA 30052

Cap Repairs at the Miller Bottom Road Landfill
Infrastructure
Bidding
$500,000 CJ est. value
Loganville, GA 30052

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

FY 2020 CDBG Storm Drainage and Street Improvements
Infrastructure
Results
Monroe, GA

T32-D1-PavePres-Walton SR 186-131252
Infrastructure
Results
GA

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

North Cherokee 12" Water Main Replacement (Ronthor to RR) - City of Social Circle
Infrastructure
Conception
$538,180 CJ est. value
Social Circle, GA 30025

Last Updated 03/30/2023 04:10 AM
Project Title

2023 LMIG Paving Project

Physical Address View project details and contacts
City, State (County) Loganville, GA 30052   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $295,736 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of milling, paving, patching, and striping approximately 6,400 linear feet of asphalt pavement throughout the City of Loganville. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. The Issuing Office for the Bidding Documents is: Keck & Wood, Inc., 3090 Premiere Pkwy, Suite 200, Duluth, GA 30097, Contact Adam Shelton, 678-417-4000, bidquestions@keckwood.com. Prospective Bidders may obtain an electronic copy of the Bidding Documents from the Issuing Office as described below. A pre-bid conference will not be held. Bid security shall be furnished in accordance with the Instructions to Bidders. Bid security shall be submitted with each bid in the amount of 5 percent of the total bid amount. No bid may be withdrawn for a period of 60 calendar days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds either a Georgia State Contractor's License, or qualifications with the Georgia Department of Transportation for similar work, in compliance with Act. O.C.G.A. 43-14 and 43-41. Failure to provide the bidder's license or qualification number on the outside of the sealed proposal will result in rejection of the bid. If the Contract is to be awarded, Owner will award the Contract on the basis of the base bid alone. All required federal, state, and local permits as well as required easements or rights of way for the project have been obtained. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of 120 calendar days. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment submitted once per month as provided in the General Conditions.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents