Similar Projects
Rivian Automotive East Atlanta Megasite Building Vertical Construction / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Conception
$5,000,000,000 CJ est. value
Social Circle, GA 30025

Spring Street Tank 10" Water Main Loop (Tank to CSX Bore on E Hightower) - City of Social Circle
Infrastructure
Conception
$350,000 CJ est. value
Social Circle, GA 30025

SR 138 at SR 10 / US 78
Infrastructure
Design
$2,000,000 CJ est. value
Walnut Grove, GA 30052

RFQ - Blaine Station Development
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Monroe, GA 30655

Planet Fitness / Loganville
New Construction, Infrastructure - 19,265 SF
Bidding
$5,000,000 CJ est. value
Loganville, GA 30052

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Piedmont Regional Industrial Park Site Grading
Infrastructure
Post-Bid
GA

Agriculture Meter Installation
Infrastructure
Results

Water Meter Replacement Project
Infrastructure
Results
$95,000 est. value
Helen, GA

Loganville Dental Office
New Construction, Infrastructure - 4,200 SF
Pending Verification
$900,000 CJ est. value
Loganville, GA 30052

Brand Road Convenience Store and Gas Station
New Construction, Infrastructure - 3,237 SF
Pending Verification
$1,000,000 CJ est. value
Loganville, GA 30052

Industrial Area Sewer Extension East Hightower to Interceptor - City of Social Circle
Infrastructure
Conception
$1,122,636 CJ est. value
Social Circle, GA 30025

Lake Carlton Road Culvert Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Loganville, GA 30052

Water System Project
Infrastructure
Post-Bid
GA

North Loop Water Transmission Main
Infrastructure
Results
GA

Last Updated 09/24/2022 08:02 AM
Project Title

North Cherokee 12" Water Main Replacement (Ronthor to RR) - City of Social Circle

Physical Address View project details and contacts
City, State (County) Social Circle, GA 30025   (Walton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $538,180 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

North Cherokee 12" Water Main Replacement (Ronthor to RR) As September 24, 2022, this project is currently in the FY 2021/22 - FY2 5/26 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023 - 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023 - 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents