Similar Projects
Stream Restoration of Tusico Branch (Phase 2)
Bidding
Fairfax, VA

Herndon Metrorail Intermodal Access Improvements Project
New Construction
Bidding
Herndon, VA

Piney Branch Stream Restoration - Construction
Post-Bid
Vienna, VA 22160

Spring 2019, Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
Fairfax, VA 22035

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Restoration Project of Accontick Creek
Results
Fairfax, VA

Old Courthouse Road Pedestrian Access Improvements
Post-Bid
Vienna, VA

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Drainage Improvements Fairfax Camp 30 AHQ Maintenance Facility
Post-Bid
Fairfax, VA 22030

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Stream Bank Stabilization at Mason`s Shenandoah Parking Garage
Results
Fairfax, VA 22030

Chandon Park Trail Improvements
Results
Herndon, VA 20172

Tusico Branch Stream Restoration
Results
Fairfax, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Last Updated 11/14/2019 11:19 AM
Project Title

Pedestrian and Drainage Project

Physical Address View project details and contacts
City, State (County) Fairfax, VA   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,467,755
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to, installation of erosion control devices, tree preservation and removal, excavation and grading, demolition of existing features, installation of storm sewer, drainage structures, and a SWM/BMP facility, watermain relocation, water and sanitary service relocation, curb, curb and gutter, placing aggregate, asphalt paving, brick and concrete sidewalk, curb ramps, concrete steps, handrail, retaining walls (masonry, gravity, and post-and-panel walls), brick fence, concrete safety barrier, decorative street lights, retaining wall lights, terrace up-lights, landscaping, installation of signage and pavement markings, restoration of existing features, and all measures required for the maintenance of traffic during construction including the implementation of detours. All work shall be performed in accordance with applicable federal, state and City requirements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents