Similar Projects
SR 826/Palmetto Expressway Capacity Improvement Project (FPID)
Bidding
Miami Lakes, FL 33014

Resurfacing
Bidding
$6,024,990 est. value
FL

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Miami Circle
Post-Bid
Miami, FL 33131

Roadway Improvements Project - Northeast 125th Street
Results
North Miami, FL 33161

Miscellaneous Roadway and Drainage Improvements
Results
Cutler Bay, FL 33189

Intersection Improvement
Bidding
$4,726,324 est. value
FL

DMS Courtyard Replacement
Post-Bid
Miami, FL 33128

Push Button Roadway Resurfacing-North
Results
Less than $1,620,984 est. value
Miami, FL

Railroad Intersection Improvement
Bidding
$34,326,701 est. value
FL

Jackson North Medical Center Asphalt Repairs (SBE Set Aside)
Post-Bid
Less than $50,000 est. value
Miami, FL 33169

Push Button Roadway Resurfacing- South
Results
Less than $1,620,984 est. value
Miami, FL

Push Button Intersection Improvements-North
Bidding
$1,583,934 est. value
FL

Rickenbacker Causeway Green Bike Lanes Segment A - Phase I
Post-Bid
Less than $1,950,000 est. value
Miami, FL 33128

207th Street Right Lane Extension
Results
Less than $302,280 est. value
Miami Gardens, FL 33056

Last Updated 02/14/2020 08:06 AM
Project Title

Roadway Resurfacing - Mulitiple Site

Physical Address View project details and contacts
City, State (County) Miami, FL 33128   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $999,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to the following: Milling and resurfacing, widening and resurfacing of intersecting streets, up to the existing joint at the side street or up to the point of curvature as determined by the Engineer or as indicated in the Plans, resurfacing of asphaltic pathways (pedestrian, bicycle, etc.) adjacent or not to the edge of pavement as necessary, temporary utility repairs (cold patches), clearing and excavating of shoulder areas or build-up, as directed by the Engineer; grading and clean-up of adjacent shoulders and removal of roots,as required, pavement markings including the installation of reflective pavement markers (blue/blue) at fire hydrant locations, sidewalk, sidewalk curbs and connectors, and pedestrian ramps. The Engineer will make the final determination of any changes required due to conflict of design and or field conditions. Location: 1-NE 158 St from NE 12 Ave to NE 16 Ave 2-NE 150 St from N. Spur Drive to NE 2 Ave 3-NE 163 St from N. Miami Ave e to NE 2 Ave 4-N. Biscayne Drive from NW 1 Avenue to NW 6 Ave 5-NW 143 St from NW 7 Ave to NW 17 Ave 6-NW 31 Ave from NW 83 St to NW 82 St 7-NW 81 St from NW 31 Ave to NW 32 Ave 8-NW 83 St from NW 36 Ave to NW 35 Ave 9-NW 33 Ave from NW 87 St to NW 85 St

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents