Similar Projects
Main Street Overlay From 6th Avenue to 8th Avenue - City of Edmonds
Infrastructure
Conception
$937,000 CJ est. value
Edmonds, WA 98020

Main Street Overlay From 6th Avenue to 8th Avenue - City of Edmonds
Infrastructure
Conception
$937,000 CJ est. value
Edmonds, WA 98020

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

RFQ D/B - Arlington Operations Center Redevelopment Design Build Services
New Construction, Term Contract, Infrastructure
Bidding
$35,000,000 CJ est. value
Arlington, WA 98223

SR 530 59th Ave NE & 211th Pl NE Intersection Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Arlington, WA 98223

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

SR 529/NB Snohomish River - Bridge Rehabilitation
Infrastructure, Renovation
Design
$8,876,000 CJ est. value
Everett, WA 98201

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Last Updated 02/08/2023 07:06 AM
Project Title

SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance

Physical Address View project details and contacts
City, State (County) Snohomish, WA 98296   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $2,296,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID WDNW-1126 This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits. As of February 08, 2023, this project is in design status. Preliminary engineering has begun and environmental design is expected to be complete in the fourth quarter of 2019. The contract advertisement is expected in first quarter of 2025 and construction is anticipated to be operationally complete in the fourth quarter of 2025. WSDOT - SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents