Similar Projects
Airport Taxiway C/M Rehabilitation - City of Eugene
Infrastructure
Conception
$956,667 CJ est. value
Eugene, OR 97402

Martin Luther King Jr. Boulevard Transit and Safety Improvements - City of Eugene
Infrastructure
Conception
$600,000 CJ est. value
Eugene, OR 97401

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

Dexter Fish Facility Upgrades Project
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Lowell, OR 97452

Dexter Fish Facility Upgrades Project
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Lowell, OR 97452

Camas Ridge Community Elementary School
New Construction, Demolition, Infrastructure - 74,500 SF
Post-Bid
$17,000,000 est. value
Eugene, OR 97403

Valve and Fitting
Infrastructure
Post-Bid
Springfield, OR

OR99: Urban Upgrade (Cottage Grove) on Goshen-Divide Highway (Rt. No. OR99) in Cottage Grove
Infrastructure, Alteration
Results
$2,000,000 to $5,000,000 est. value
OR

US101: Munson Creek Invert Pave Project MP 72.42
Infrastructure
Results
$240,000 est. value
Florence, OR 97439

YMCA / Eugene
New Construction, Infrastructure
Construction
$34,000,000 CJ est. value
Eugene, OR 97405

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

Lincoln Street Protected Bike Lanes - City of Eugene
Infrastructure
Conception
$1,288,000 CJ est. value
Eugene, OR 97401

Coburg Loop - N. Coburg Industrial Way
Infrastructure
Design
$499,877 CJ est. value
Fall Creek, OR 97438

River Road at Irving Road
Infrastructure
Bidding
$2,200,000 CJ est. value
Eugene, OR 97404

Last Updated 01/09/2023 12:31 AM
Project Title

OR DOT 18(2) OR58: Fix it Corridor Culverts

Physical Address View project details and contacts
City, State (County) Oakridge, OR 97463   (Lane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $6,107,054 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Jan 05, 2023 Contract Award Number: 69056723C000007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: SNXHBP5M8US3 Contractor Awarded Name: HP CIVIL INC Contractor Awarded Address: Salem, OR 97317-9157 USA Base and All Options Value (Total Contract Value): $6107054.44 Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov. FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing. Submit questions via e-mail at wfl.plans-spec@dot.gov. QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website https://sam.gov/ . o Insert the solicitation number in the search box o Scroll to the project. o Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document. FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 415.625.7716 (DRBA - Western Region) FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. Physical Data will be posted with the solicitation on the Sam.gov website. Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1. Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units. Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1). ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP14, U.S. Customary Units. Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14, U.S. Customary Units. A-6 Continuation SF 1442 OR DOT 18(2), OR58: Fix-it Corridor Culverts ESTIMATED PRICE RANGE. The price range of the project work is between $5,000,000 and $7,000,000,000. Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount Commencement, Prosecution, and Completion of Work (Apr 1984) Alternate I (Apr 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/09/2023 subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 01/24/2023. The completion date will be extended by the number of calendar days after the above date that the contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 11/28/2022

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents